My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRANK WEST
>
120
>
2300 - Underground Storage Tank Program
>
PR0515365
>
COMPLIANCE INFO_2006-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 1:42:31 PM
Creation date
6/3/2020 9:59:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2009
RECORD_ID
PR0515365
PE
2361
FACILITY_ID
FA0012107
FACILITY_NAME
A TEICHERT & SON INC*
STREET_NUMBER
120
STREET_NAME
FRANK WEST
STREET_TYPE
CIR
City
STOCKTON
Zip
95206
APN
19342006
CURRENT_STATUS
01
SITE_LOCATION
120 FRANK WEST CIR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRANK WEST\120\PR0515365\SUMP REPAIR 2008.PDF
QuestysFileName
SUMP REPAIR 2008
QuestysRecordDate
11/10/2015 5:47:54 PM
QuestysRecordID
2922518
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mar -20-07 10:41 am F rom-Gett I er-Inc +925 551 78QD-M- T-333 P-005/010 F-136 <br />op <br />RETROFIT OR REPAIR <br />1 Site map enclosed YES [] NO V <br />2. Spec sheets attached for equipment to be installed YES [v( NO <br />3. Description of work to be completed: <br />Upgrading to a single port manway with one bucket on a diesel tank. The station currently has a CNI two <br />point multi port fill (for sEeed) manway. We will cap off one of the existing riser and leave it installed in the <br />tank manway, <br />Pie se note, this work will not require removing any concrete. <br />4. Description of equipment to be used: <br />C SPILL BUCKET <br />5. All equipment is State certified or approved. YES 6( NO <br />6- Decontamination Procedures: <br />a. Will piping be decontaminated prior to removal? YES[] NO[] <br />b. Identify contractor performing decontamination: <br />Name Phone(_)_ <br />Address City Zip <br />C. Describe method to be used for decontamination, <br />d. Describe how rinsate material will be stored onsite prior to manifesting offsite: <br />e. Rinsate Hauler and permitted Treatment, Storage & Disposal Facility: <br />Hauler Name <br />K, <br />Phone(_) <br />
The URL can be used to link to this page
Your browser does not support the video tag.