My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRANK WEST
>
120
>
2300 - Underground Storage Tank Program
>
PR0515365
>
COMPLIANCE INFO_2006-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 1:42:31 PM
Creation date
6/3/2020 9:59:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2009
RECORD_ID
PR0515365
PE
2361
FACILITY_ID
FA0012107
FACILITY_NAME
A TEICHERT & SON INC*
STREET_NUMBER
120
STREET_NAME
FRANK WEST
STREET_TYPE
CIR
City
STOCKTON
Zip
95206
APN
19342006
CURRENT_STATUS
01
SITE_LOCATION
120 FRANK WEST CIR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRANK WEST\120\PR0515365\SUMP REPAIR 2008.PDF
QuestysFileName
SUMP REPAIR 2008
QuestysRecordDate
11/10/2015 5:47:54 PM
QuestysRecordID
2922518
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$WRCB; January 2002 <br />Page 2 . <br />9. S LL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes: <br />Spill/Overfill Containment Boxes are Present, but were Not Tested: <br />Test Method Developed By: <br />F-1Spill Bucket Manufacturer Industry Standard ❑Professional Engineer <br />Other (Specify) <br />Test Method Used: <br />❑ Pressure F-1 Vacuum Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: <br />Equipment Resolution: <br />Spill Box # 1 DIE FILL Spill Box # 1 DIE FILL Spill Box # 2 UNL FILL Spill Box # 3 WAS FILL <br />Bucket Diameter: <br />12 12 12 12 <br />Bucket Depth: <br />14 14 14 13 <br />Wait time between applying <br />pressure/vacuum/water and <br />5 5 5 5 <br />starting test: <br />Test Start Time: <br />0940 0940 0940 0940 <br />Initial Reading (RI ): <br />11 11 11 8.25 <br />Test End Time: <br />1000 1000 1040 1040 <br />Final Reading (RF ): <br />10.50 10.50 11 8.25 <br />Test Duration: <br />20 MINS. 20 MINS. 60 MINS. 60 MINS <br />Change in Reading (R F- RI) <br />0.50 0.50 0 0 <br />Pass/Fail Threshold or <br />Criteria: <br />MM Em <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.