Laserfiche WebLink
^ oo7-20-2008 03 :05 PM GErrLEn-RYAN INC. 925 551 *770 p' 05 <br /> Monitoring System Certification <br /> F. 0n-Tank Gauging/SIR Equipment: [] [heckthis box iftank gauging isused only for inventory control, <br /> [] Cbevk(|l{o6ox |fnutank gao&' ooSIR equipment{^installed. <br /> This section must he completw if in-tank gauging equipmentiaused to perfonn }eak detection monitoring, <br /> Complete the following checklist: <br /> Z Yes 0 No* Has all input wiring beim inspected for proper entry and iermination, ineluding testing for ground 6ults? <br /> 7i-);es 0 No- Were all tank gauging probes visually inspected for damage and residue buildup'? <br /> 0 Yes 0 NO Was accuracy of systeni product IMI readings tested'! <br /> 0 Yes 0 'No* Was accuracy Of system water level readings tested'? <br /> 0 Yes El No* Were all probes reinstalled properly'? <br /> 0 Yes El No* Were all item-4 on the equipment manufacturer's maintenance checkligi completed'? <br /> *In the Section H,below,describe how and When these dericiencies Were or will be corrected, <br /> G. Line Leak Detectors (LI^D): [] 1`hochthis box ifLLDwarc!n*t im*mUeJ. <br /> -Complete the feno nIZ checklist: <br /> 0 No* For equipment start-up or annual equipment MtifiCalion, was a leak simulated to verify T.J.D performance? <br /> El N/A (Check all that app�v) Simulated leak rate: 0 3 g.p.h.� 0 0.1 g.p.h C.1 0,2 g.p.h. <br /> (9 Yes 0 No* Were all IJ.Ds confirmed operational and accurate within regulator�y requirements'? <br /> 0 Yes 0 No* Was the testing apparatas properly calibrated'? <br /> 0 Yes 0 NO* For mechanical LIA)%,does the 11.13 rustrict produc flow if it V <br /> 0 Yes 0 No, For electrunic I.A.Ds,does the turbine automatically shut MY ifthe 1.11)detects a leak'? <br /> C@ Yes El No,' For electronic LI_Ds, does the turbine automatically shin offi F any portion of the monitoring systern is disabled <br /> 0 N/A or disconnected'? <br /> N Yes C1 No* For clectronk;LLDs,does the turbine automatically shut offif any portion of'the monitoring 9,Atem malfunctions <br /> 0 Yes El No* For elec,tranic 11-Ds,have all accessible wiring connections been visually inspected'? <br /> El N/A±�_ <br /> 0 Yes 0 jNo* Were all items on the equipment manufacturer's maintenance checklist completed'? <br /> In the Section H,below,describe how and when these deficiencies were or Will be corrected. <br /> H. Comments: ........ <br /> �------------'--------- <br /> _......... <br /> ................_'_ ........_______-_--__-__-_-_.......................-.......... ...... __--- -__ -__ __- _'_______-^_.-~'-~__- <br /> _-_-________. '-'__'__'__- <br /> _-.... ......... -... .... _. <br /> Page 3 of 3 <br />