Laserfiche WebLink
INSTALLATION OF COMPLETED ASSEMBLY INTO THE TANK <br />Step 21: Turn completed assembly upside down and shake vertically to <br />remove any metal chips left from the drilling process. <br />Stea 22: Install the O-ring (p/n <br />561683, supplied) on the top flange. <br />Step 23: Position the completed <br />assembly vertically over the riser <br />pipe with the square cut down. <br />Carefully lower the completed drop <br />tube/valve assembly into the riser <br />pipe. <br />to 24: Use the hose clamp <br />to clamp the warning plate (p/n 564420, <br />supplied) onto the riser below the threads. <br />Make sure label is facing up. <br />to 25: Reinstall the adapter onto the <br />riser and torque with an adapter wrench. <br />Replace the tightfill cap. <br />The system is now in place and ready for operation. <br />