Laserfiche WebLink
Executive Order VR -104-C, 10, Manufacturing Phase I Vapor Recovery Sy em, Exhibit 2, Page 5 <br />Figure 2A <br />Typical Product Side Installation of CNI Manufacturing 2 Point System <br />Model CON2 using DT100 Drop Tube <br />1 A0030-124 or/ <br />. _ ``' „ • WHEATON <br />rubberBuna N Product .... adaptor <br />RP12-PUSH 4" N.P.T. Containment nipple <br />Drain Valve Assembly with tapered threads <br />® (Supplied by others) <br />DT101, RP101 <br />0.210" "O" -ring <br />Buna N, rubber <br />(For DT100 drop tube) 200JN <br />Drop tube <br />jam -nut <br />NOTE: 4" N.P.T. Tank riser <br />Unless noted, all products are with tapered threads <br />manufactured by CNI MFG. (Supplied by others) <br />DT100 <br />Drop tube <br />NOTE: V <br />The discharge opening of the fillpipe must Scale=N.T.S. <br />be entirely submerged when the liquid level <br />is six inches (6") above the bottom of the tank. <br />CNI Manufacturing Phase I Vapor Recovery System — VR -1 04-C <br />STP -200 <br />_ <br />Snap -tight cover <br />GAC <br />Includes: STP -4 <br />Gravity cover <br />gasket, Buna N rubber <br />Includes: GAC-GSK <br />gasket, Buna N <br />64 <br />rubber <br />Product dust cap <br />RP 65 <br />o <br />Replacement gasket <br />0 0 o <br />000 0 0 0000 <br />Buna N rubber <br />STP -39 Snap Tight <br />000000 <br />o000o <br />Cover Ring , <br />STP -33 <br />Includes STP -10 O-ring, <br />° 00 <br />3 Piece bellows <br />Buna N rubber <br />��-- <br />hold down clamp <br />1 A0030-124 or/ <br />. _ ``' „ • WHEATON <br />rubberBuna N Product .... adaptor <br />RP12-PUSH 4" N.P.T. Containment nipple <br />Drain Valve Assembly with tapered threads <br />® (Supplied by others) <br />DT101, RP101 <br />0.210" "O" -ring <br />Buna N, rubber <br />(For DT100 drop tube) 200JN <br />Drop tube <br />jam -nut <br />NOTE: 4" N.P.T. Tank riser <br />Unless noted, all products are with tapered threads <br />manufactured by CNI MFG. (Supplied by others) <br />DT100 <br />Drop tube <br />NOTE: V <br />The discharge opening of the fillpipe must Scale=N.T.S. <br />be entirely submerged when the liquid level <br />is six inches (6") above the bottom of the tank. <br />CNI Manufacturing Phase I Vapor Recovery System — VR -1 04-C <br />