Laserfiche WebLink
Veeder-Root Line Leak ApplicOn Guide <br />3. Verify that the CPT Controller has Version 1.02 or later software installed. <br />• <br />4. Locate red switch bank labeled S1 on the CPT's Controller CPU board, and verify that dip switch 2 is set to the Closed <br />position (to enable the PLLD precision line leak function), and dip switch 8 is set to the Open position (to disable the CPT's <br />line leak function). <br />5. Verify that the Rotary Pressure Dial, also on the CPT's Controller CPU board, is set to either the 2 (24 psi), 3 (27 psi), 4 (30 <br />psi), 5 (33 psi), or 6 (36 psi) position. <br />-------------- <br />L , % <br />• <br />C0* <br />•. <br />0 <br />PLLDtransducer 0 <br />in SwiftCheck <br />• o Valve SpikeCheck <br />Functional Valve Assy. <br />' O <br />Element <br />Red Jacket Standard CPT Red Jacket Quantum CPT <br />Transducer Installation - Red Jacket Big -Flo and Maxxum Pumps <br />BIG-FLO PUMPS <br />1. You will need to install a reducing tee (customer supplied) in either of the 3 -inch discharge ports of the pump with the 2 - <br />inch opening facing up. If you have the room, it may be easier to install this tee between the Pressurstat kit and the unused <br />port instead of in the discharge line (as shown in the figure below). Alternatively, the PLLD transducer can be installed in <br />the leak detector port of a Big -Flo leak detector if it is already present in the line (as shown in the figure below). <br />2. Install the Red Jacket Big -Flo Pressurstat Kit (Red Jacket part number 144-314-5) following the instructions with the kit. <br />3. Thread the PLLD transducer into the 2 -inch opening of the tee. <br />IMPORTANT! Seal any pipe threads using a UL -classified, nontoxic pipe sealant suitable for the fuel involved. <br />4. Verify that the TLS -350 Console has Version x19 or later (TLS -450 has Version 1 or later) software. <br />11 <br />