Laserfiche WebLink
Underground Storage Tank Monitoring Plan-19W <br /> UST Monitoring Site Plan <br /> . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . D <br /> . . . . . . . . . . . . . . . . . <br /> . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C.. . D. . . . . . <br /> . . . . . . . . . . . . . . . . . . . . ..n . . . . . . . 1�. . . . . . . . . . . . . . . . . . <br /> Date map was drawn or revised:—:ZZ j <br /> Instructions <br /> If you already have a diagram (e.g. your Hazardous Materials Business Plan Site Plan/Storage Map) which <br /> shows all required information, you may include it, rather than this page, with this monitoring plan. On your <br /> site plan, show the general layout of tanks and piping in relation to nearby buildings or other structures. Clearly <br /> identify locations of the following equipment, if installed: monitoring system control panels; mechanical or <br /> electronic line leak detectors; sensors monitoring tank annular spaces, sumps, trench systems, under-dispenser <br /> containment, or other secondary containment areas; and, if ATG is required, in-tank liquid level probes. In the <br /> space provided, note the date the drawing was prepared. <br /> nv_n"e _616 <br /> www.unidocs.org Rev.07/02/02 <br />