My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1330
>
2300 - Underground Storage Tank Program
>
PR0515864
>
COMPLIANCE INFO_2000-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:09:22 PM
Creation date
6/3/2020 9:59:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2009
RECORD_ID
PR0515864
PE
2361
FACILITY_ID
FA0012355
FACILITY_NAME
A&A GAS FOOD MART
STREET_NUMBER
1330
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22120053
CURRENT_STATUS
01
SITE_LOCATION
1330 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0515864_1330 E YOSEMITE_2000-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05/07/2003 16:20 408971Q135 SSS INC PAGE 04 <br />Monitoring System Certification - Page 3 of 3 <br />Site .Address; 1330 E. Yosemite_ Highway 99 Date of Testing/Servicing: 419/03 <br />F, I,n - Tank Gauging / SIR Equipment, 0 Check this box if tank gauging is used only for inventory control. <br />M Cltcelc this Lux if ito tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />C amnlete the following checklist; <br />❑ Yes <br />* <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, ineiudmg testing for ground faults? <br />❑ Yes <br />0 No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No* <br />Was accuracy of system product level readings tested'? <br />❑Yes <br />❑ NO <br />Was accuracy of system. water level readings tested? <br />0 Yes <br />❑ .No* <br />Were all probes reinstalled properly! <br />❑ Yes <br />0 No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />in section H below, aeserine now anu when mese aeac,eacacs WC1C ue "RAI uc ave,ea6eee, <br />G. Line Leaf Detectors (LLD): ® Check this box if LLD's are not installed. <br />VV+LC ■V61r <br />4++v s <br />®Yes <br />0 No" <br />For equipment start-up or annual equips icut ccrtificatiou was a leak sixaulatcd to verify LLD performance? <br />❑ N/A <br />(CFaeck all that apply) Simulated Leak reate: X 3 g.p.h. (1.); 0 0.1 g.p.h. (2.); 0 0.2 g_p.h. (2.). <br />Notes: 1. Required for equipment start-up certification and annual certification. <br />2. Unless mandated by local agency, certification required only for electronic LLD start-up. <br />❑ Yes <br />® No* <br />Were all LLD's confirmed operational and accurate within regulatory requirements? <br />1111 Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />0 Yes <br />0 No* <br />For mechanical LLD's, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />II Yes <br />❑ No* <br />For electronic LLD's, does the turbine automatically shut off if the LLD detects a leak? <br />0 N/A <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />0 Yes <br />❑ No* <br />a N/A <br />or disconnected? <br />Q Yep <br />a No* <br />For c1cu ,uniu LLD's, does the turbine automatically shut off if any portion of the monitoring system <br />0 NIA <br />malfunctions or fails a test? <br />0 Yes <br />❑ No* <br />For electronic LLD's, have all accessible wiring connections been visually inspected? <br />l9 N/A <br />® Yes <br />❑ No's <br />Were all iters on the equipment manufacturers maintenance checklist completed? <br />* In Section f1 below, describe how and when these dei'iciencies were or will be corrected. <br />FL Ct xamei ts. Pic i i leak detector bad. Replaced leak detector and all tested ok. <br />Prem vapor bucket leaks_ Diesel fall bucket has a crack. Reg fill and vapor. ok_ Prem fill bucket ok. Replaced diesel. <br />fill bucket and repaired premium vapor bucket. All tested ok <br />
The URL can be used to link to this page
Your browser does not support the video tag.