Laserfiche WebLink
04/18/2000 10:30 2094683433 <br />lir SYSTEM DRAWING INFORMATICN <br />FIFTH FLOOR <br />PAGE 06 <br />1. <br />Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br />2. <br />Piens drawn to scale in non -erasable print. <br />U.L. LISTED <br />3. <br />Plat pian to show location of tanks and all associated piping. <br />4. <br />Striker plates or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />5. <br />Tank cross-sectional diagram. <br />6. X <br />Detail of tank, associated piping, excavation and cover. <br />7. Y <br />Tank(s) and piping approved by a nationally recognized independent testing organization. tritle 23. <br />Chapter 16, <br />Article 3, Section 2631 (b) & 26353 <br />B. <br />verification of product compatibility with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. <br />9. <br />Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br />10. <br />At the installation site, prior to instattation, a tightness test shall be performed on both primary <br />(10) and <br />secondary (20) containment systems before covering_ [Section 2635 (a) (3) & (4)) <br />11. <br />Tank integrity test required Upon completion of installation with tank in operating condition. rest <br />results to be <br />submitted directly to PHS-EHo from the testing company or owner of facility. (Health & safety code, <br />Division 20, <br />Chapter 6.7, Section 25291 (h)) <br />12. TANK COMPOSITION <br />TANK N <br /># � '2,s M u <br />CAPACITY <br />�%C% 0 {� 'JQ Q �� Qi 0 <br />MANUFACTURER <br />C014POS I T I ON <br />f` `¢ /ass ji6Et /wits 1,14ee l~ <br />MODEL <br />ponnucl <br />J)rrJ WkAir7 Il -. 2-0 T'11 <br />CORROSION PROTECTION <br />� y <br />;bra /w ss j,��et/arcs ji6E¢ /sr� <br />U.L. LISTED <br />S Et 63 <br />COMPATTUILITY WITH 100. <br />METHANOL <br />13. TANKcs) Ya U INSTALLED <br />A. Steet-ctad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />coatings or coverings. <br />(1) Tested at the installation site using an electric resistance holiday detector. <br />(2) vacuum applied to interstitial space. <br />B. Fiberglass <br />�, (1) Installation instructions require an air test and soap bubble test prior to installation. <br />(2) vacuum applied to interstitial space. <br />(3) Hydrostatic annular (primary tank pressure test). <br />C. Mtn -clad steel tank (Section 2635 (a) (2) (A)1 <br />(1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />(2) Field installed cathodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />(3) Impressed current systems to be inspected no less than every 60 days. <br />