04118/2000 10:30 2094683433 FIFTH FLOOR PAGE 09 <br />19. Piping (cross-sectional 0"am, including connections to tank and dispts). <br />(A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br />_ Restricts delivery of flow to tank Nection 2635 (b) (2) (B) or (C)1, or <br />Provide positive shut off of flow to the tank at nc more than 95 % [Section 2635 (b)(2)(03, or <br />(B) <br />Vapor <br />recovery piping designed so it cannot contain liquid phase product, or <br />(C) <br />suction piping (below grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)] <br />_ sloped so contents of the pipe wilt drain back into the storage tank if the suction is <br />released. <br />No valves or pumps instelled below grade. <br />_ Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br />(03 <br />corrodible underground piping protected against corrosion (Section 2636 (b)). <br />(E) <br />Underground primary piping will meet all of the following requirements <br />Primary piping in contact with hazardous substance under normal o ration conditions shall be: <br />installed inside a secondary containment system in the form of secondary pipe_ vault or <br />lined trench to be sloped to a collection sump at the tow t of the piping. <br />( / <br />Primary piping and secondary containment systems will be installed in accordance with industry <br />code of practice and voluntary consensus standards.. <br />Lined trench used as secordary containment <br />Material compatible with the substance stored. <br />Covered and capable of supporting any expected vehicular traffic. <br />(F) <br />Underground piping with secondary containment will be equipped and monitored as follows: <br />Secondary containment will be equipped <br />with a continuous monitoring system connected to an audible <br />and visual alarm system. <br />Automatic tine leak detectors will be instal on pressu -zed piping <br />Manufacturer: -M 1Vt ( MadeL;� coo <br />Annual monitoring will be conducted on the Pressurized piping with secondary containment. <br />Annual line tightness test will not be required if the continuous monitor shuts down the pomp and <br />activates the alarm system when a release is detected and when the continuous monitoring system <br />\x/ <br />fails or is disconnected. <br />20. { <br />State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br />21. <br />Plan review and operating permit fees paid. <br />22. What is the approximate depth to ground water: <br />(include source of information, - borehole logs, monitoring well data, water <br />studies, etc.) <br />23. Total nuinber of tanks on site after instaltation:lkiLz-3Tke Ef . <br />24. County/City Fire District and Building Department notified. <br />25. in the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br />responsibility Lin accordance with (CBR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br />Requirements] as an owner or operator to submit a workptan to PHS-ERD Site Mitigation Unit prior to initiating any <br />assessment or re iation activities. For further assistance contact the Site Mitigation Unit at (209) 469.3450. <br />The owner o ator must acknowledge this respons" ility for workptan submittal by signature and date below. <br />Name Title 1141i Date /'#d� <br />CONDITIONS OF APPROVAL - <br />9 <br />