Laserfiche WebLink
P4/18/2000 10:30 2094683433 FIFTH FLOOR PAGE 09 <br />19. Piping <br />• <br />(cress- including <br />sectionalram, connections to tank and dispc;-.ers). <br />(A) Vent and cank riser primary containment system equipped with overfill prevention system that: <br />_ <br />Restricts delivery of flow to tank (Section 2635 (b) (2) (8) or (C)I, or <br />Provide positive shut off of flow to the tank at nc more than 45 % [Section 2635 (b)(2)(03, or <br />Cs) <br />vapor recovery piping designed so it cannot contain liquid phase product, or <br />(C) 1 <br />Suction piping (below grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)1 <br />_ Sloped so contents of the pipe wilt drain back into the storage tank if the suction is <br />released. <br />_ No valves or peurrps installed below grade. <br />_ Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br />CO) <br />Corrodible underground piping protected against corrosion (Section 2636 (b)). <br />(E) <br />Underground primary piping wilt meet all of the following requirements <br />Primary piping in contact with hazardous substance under nornat o ration conditicns shall be: <br />installed inside a secondary containment system in the form of: secondary pipe Vault or <br />Lined trench to be sloped to a eotteetion sump at the low t of the piping. <br />Primary piping and secondary containment systems will be installed in accordance with industry <br />code of practice and voluntary consensus standards.. <br />_ Lined trench used as secondary containment <br />_ Hateriat compatible with the substance stored. <br />_ Covered and capebte of supporting any expected vehicular traffic. <br />(F) Underground piping with secondary containment will be equipped and monitored as follows: <br />Secondary containment will be equipped with a continuous monitoring system connected to an audible <br />and visual alarm system. <br />Automatic tine leak detectors wilt be instaLtAw on pressu ized piping <br />Marufacturer:��M Model:_ <br />annual monitoring witt, be conducted on the pressurized piping with secondary containment. <br />Annual tine tightness test wilt not be required if the continuous monitor shuts down the perp and <br />activates the alarm system when a release is detected and when the continuous monitoring system <br />fails or is disconnected. <br />Re <br />20. State Watersources Control Board "Facility (A)" and "Tank Permit CB)" application forms submitted. <br />21. Plan review and operating permit fees paid_ <br />22. What is the approxie'�ate depth to ground water: <br />(include source of information - borehole logs, monitoring well data, water <br />studies, etc.) <br />23. Total n amber of tanks on site after installation: <br />24. County/City Fire District and Building Department notified. <br />25. In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br />responsibility (in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br />Requirements] as an owner or operator to submit a workptan to PHS-EHD Site Mitigation Unit prior to initiating any <br />assessment or re iation activities. For further assistance ccntact the Site Mitigation Unit at (209) 469.3450. <br />The owner o atom must acknowledge this responsility for workptan submittal by signature <br />and date below. <br />Name 4itle //At`f Date <br />COwDITIONS OF APPROVAL: <br />0 <br />