My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1330
>
2300 - Underground Storage Tank Program
>
PR0515864
>
COMPLIANCE INFO_2000-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:09:22 PM
Creation date
6/3/2020 9:59:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2009
RECORD_ID
PR0515864
PE
2361
FACILITY_ID
FA0012355
FACILITY_NAME
A&A GAS FOOD MART
STREET_NUMBER
1330
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22120053
CURRENT_STATUS
01
SITE_LOCATION
1330 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0515864_1330 E YOSEMITE_2000-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. =4 of the TLS-3XX Site Prep Manual, P/N 576013-879, must be consulted for proper installation of the <br /> Carbon Canister into hazardous locations with direct wiring. <br /> 2. During the installation,all required National,State and local safety codes must be followed. <br /> 3. The CCVP contains an integral vapor valve that operates in parallel with the site pressure/vacuum (P/V)vent. <br /> Location of the vapor valve outlet must conform to Article 514 of the National Electrical Code (NEC)and <br /> NFPA 30130A. <br /> 4. Do not install the CCVP on unsupported vent pipes. If the vents are not attached to a support structure or a <br /> wall,a support structure must be installed prior to mounting the CCVP. <br /> 5. A straight coupling or union is required at the base of the vent pipe installation. For new or rebuilt sites,it is <br /> recommended that the installation design specify a threaded fitting for joining the vent pipes to the <br /> underground piping system. <br /> A 6. IMPORTANT!To assure that the canister outlet is 12 feet(minimum above grade,the CCVP <br /> ALmounting bracket must be located as shown In Figure I and the U-bolts;tightly damped to the <br /> vent pipe before mounting the canister. <br /> 7. Following all required national,state,local and site safety precautions,carefully hang the CCVP's notched <br /> support tabs onto the top two side studs of its mounting bracket(Step 1 in Figure 2),swing the canister down <br /> until all of the slots in the canister's side mounting tabs seat against the studs in the bracket(Step 2 in <br /> Figure 2),then tighten the six side nuts to secure the canister onto its bracket(Step 3 in Figure 2). <br /> 8. Figure 3 shows important reference dimensions and required clearances of the installed canister. <br /> 9. Install weather tight junction boxes (2 required)and conduit per all NEC,State and local codes(see example <br /> installation in Figure 1). <br /> 10. Connect the two-pin connector of the 6-foot cable provided in the installation kit to the CCVP vapor valve, <br /> observing plug polarities(see Figure 4).The other end of this cable is passed through a kit supplied cord grip <br /> in the upper junction box. <br /> 11. Connect the white wire of the two conductor cable from the vapor valve to the positive sensor wire from the <br /> TLS Console Smart Sensor Interface module(see Figure 5).Connect the black wire on the two conductor <br /> cable to the negative sensor wire from the TLS Console Smart Sensor Interface module. <br /> 12. Following the instructions in Figure 6,sea[the wire nuts of each of the two cable connections in the epoxy <br /> pack provided. <br /> 13. Attach CCVP vapor valve field wiring to the Smart Sensor Interface Module in the TLS console as shown in <br /> Figure 7. <br /> 14. Connect all lower fittings,valve and tubing between the vent pipe and the lower manifold on the CCVP. <br /> 15. Confirm ball valve is in the open,canister to vent stack position (per Figure 3),then insert the clevis pin and <br /> secure with the hitch pin. <br /> 16. A passing pressure decay test,in accordance with CARS TP-201.3,must be completed after the CCVP is <br /> installed (see Exhibit 4 of VR 203/VR 204). <br /> 17 A passing operability test must be completed in accordance with the procedures defined in VR 203/VR 204 <br /> Exhibit 11 &12. <br /> 18-4 <br /> ARB approved IOM 18-Carbon Canister Vapor Polisher Installation and Maintenance Guide-Executive Order VR-203 and VR-204 <br />
The URL can be used to link to this page
Your browser does not support the video tag.