Laserfiche WebLink
w <br /> JST SYSTEM DRAWING INFORMATION C(,,C�. CAT !9ftTJ <br /> 1. ✓ Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed)_ <br /> 2 Plans drawn to scale in non-erasable print. <br /> 3 ✓ Plot plan to show location of tanks and all associated piping. <br /> 4• Striker plates or drop tube-mounted bottom protectors illustrated below aLL accessible openings. <br /> 5 Tank cross-sectional diagram. <br /> 6. Gy Detail of tank, associated piping, excavation and cover. <br /> 7. 6�v Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br /> Article 3, Section 2631 (b) & 26353 <br /> 8. _ <br /> 64 Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> 9. <br /> 64Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> _ <br /> 10• At the installation site, prior to installation, a tightness test shall be performed on both primary (11 and <br /> secondary (20) containment systems before covering. [Section 2635 (a) (3) & (4)] <br /> 11. Tank integrity test required upon completion of installation with tank in operating condition. Test resuits to be <br /> submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> TANK 9 <br /> CAPACITY LQA Lir' 2V alb "' O8o <br /> MANUFACTURER <br /> b0u D� <br /> COMPOSITION WAL" <br /> MODEL (0`L� _:__`` <br /> PRODUCT rd u(�� UA <br /> CORROSION PROTECTION <br /> U.L. LISTED <br /> V� <br /> COMPATIBILITY WITH 100% y��s y�jCj <br /> METHANOL <br /> 13. TANK(s) To BE INSTALLED <br /> �_L A. Steel-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> (2) vacuum applied to interstitial space. <br /> S. Fiberglass <br /> 6.6 (1) Installaticn instructions require an air test and soap bubble test prior to installation. <br /> 65 (2) Vacuum applied to interstitial space. <br /> uj (3) Hydrostatic annular (primary tank pressure test). <br /> A.tAr. C. Non-clad steel tank [Section 2635 (a) (2) (A)] <br /> (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers <br /> etc.). <br /> (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3) Impressed current systems to be inspected no less than every 60 days. <br /> 5 <br />