Laserfiche WebLink
(9. _ <br /> Piping (cross-sectional diagram, including connections to tank and dispensers). <br /> (A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br /> _ Restricts delivery of flow to tank [Section 2635 (b) (2) (B) or (C)], or <br /> _ Provide positive shut off of flow to the tank at no more than 95 % [Section 2635 (b)(2)(C)], or <br /> (B) Vapor recovery piping designed so it cannot contain liquid phase product, or <br /> (C) Suction piping (below grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)] <br /> _ Sloped so contents of the pipe will drain back into the storage tank if the suction is <br /> released. <br /> _ No valves or pumps installed below grade. <br /> _ Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br /> (0) Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (E) Underground primary piping will meet all of the following requirements <br /> Primary piping in contact with hazardous substance under normal operation conditions shall be: <br /> installed inside a secondary containment system in the form of: ✓secondary pipe Vault or <br /> _lined trench to be sloped to a collection sump at the low point of the piping. <br /> Primary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> _ Lined trench used as secondary containment <br /> _ Material compatible with the substance stored. <br /> _ Covered and capable of supporting any expected vehicular traffic. <br /> (F) Underground piping with secondary containment will be equipped and monitored as follows: <br /> Secondary containment will be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. <br /> ✓ Automatic line��t??�aak..��detectors will be install o pressurriizzgd piping <br /> Manufacturer:�G�+V 'i�� Model: (6 \ <br /> ✓ Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> V Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring system <br /> fails or is disconnected. <br /> ✓ State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br /> 21. i Plan review and operating permit fees paid. I <br /> t <br /> 22. What is the approximate depth to ground water: <br /> (include source of information - borehole logs, monitoring well data, water a �� <br /> QA-L, CKWI <br /> 23. _ <br /> Total number of tanks on site after installation: <br /> 24. County/City Fire District and Building Department notified. <br /> 25. In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility [in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> Requirements] as an owner or operator to submit a workplan to PHS-END Site Mitigation Unit Unit at (209) 469 3450.prior to initiating a- <br /> assessment or remediation activities. For further assistance contact the Site Mitigation <br /> The owner or operator must acknowledge this responsibility for workplan submittal by signature and date below. <br /> Title'i R �UI� G�—� Date <br /> Name <br /> CONDITIONS OF APPROVAL: <br />