Laserfiche WebLink
Page of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes O <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested O <br /> Test Method Developed By: D Spill Bucket Manufacturer ®Industry Standard D Professional Engineer <br /> D Other(Specify) <br /> Test Method Used: D Pressure D Vacuum ®Hydrostatic <br /> D Other(Specify) <br /> Test Equipment Used:Wayne Perry Inc. See Attached Results Equipment Resolution:.0007 <br /> Spill/Overfill Containment Box Number <br /> Bucket Diameter: <br /> Bucket Depth: 1 4�2 ' <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> starting test: <br /> Test Start Time: :G 10 : . ZZ <br /> Initial Reading(Ri): j 1.3 Z)—Zf Z)-Z ►. 305q Z,jv&U <br /> Test End Time: 10 : Q 0: Z(a :3`7 <br /> Final Reading(RF): � P.O$!7 1-2j `) <br /> Test Duration: iG ; K rll�- <br /> Change in Reading(RF-R,): 0,00o 0<�- 0,00006 O.OOLV4 0•O�-'05'7- <br /> Pass/Fail Threshold or -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 <br /> Criteria: <br /> ME <br /> - - - <br /> clod <br /> .. _ im: <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Chevron-209167 <br /> 1234 Yosemite Avenue <br /> Manteca, CA 95336 <br /> N05295-SB989 Testing <br />