My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1234
>
2300 - Underground Storage Tank Program
>
PR0516248
>
COMPLIANCE INFO_2000-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2023 3:05:39 PM
Creation date
6/3/2020 10:00:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2005
RECORD_ID
PR0516248
PE
2361
FACILITY_ID
FA0012532
FACILITY_NAME
CHEVRON STATION #209167
STREET_NUMBER
1234
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22120016
CURRENT_STATUS
01
SITE_LOCATION
1234 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0516248_1234 E YOSEMITE_2000-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
itoring System Certification <br /> Site Address: 1234 YOSEMITE AVE Date of Testing/Service: 05/24/2005 <br /> F. In-Tank Gauging/SIR Equipment Q Check this box if tank gauging is used only for inventory control. <br /> F1 Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Q Yes ❑No° Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes ❑No• Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes ®No' Was accuracy of system product level readings tested? <br /> Yes R No° Was accuracy of system water level readings tested? <br /> Yes R No° Were all probes reinstalled properly? <br /> ❑Yes ❑No• Were all items on the equipment manufacturers'maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : E] Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ®Yes ❑No ❑NSA (Check all that apply)Simulated leak rate: 0 3 g.p.h❑0.1 g.p.h E]0.2 g.p.h <br /> X Yes Q No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> X YesRNo. Was the testing apparatus properly calibrated? <br /> R Yes ®No• ❑X N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> 0 Yes ❑No- ❑N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> Q Yes QNo• ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> a Yes ❑No` ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> M Yes ❑No" ❑NIA For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> nYes ❑No• Were all items on the equipment manufacturers'maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 Based on CA form dated 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.