Laserfiche WebLink
FIED PROGRAM CONSOLIDATED FCW <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Page 1 of 2) <br /> TYPE OF ACTION ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-1. <br /> PLAN TYPE 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) � � H � � H � <br /> t. <br /> BUSINESS NAME(Same as Facility Name or DBA) 3. <br /> Chevron Station#209167 <br /> BUSINESS SITE ADDRESS 1234 Yosemite Ave 103. CPI'Y Manteca, CA 95336 104, <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers'instructions,or annually,whichever is more frequent.Such work must be erformed by qualified personnel.[z3 CCR§2632,2634,2638,26411 <br /> ................................................................................p. ............._q.._.__.................p....._.............. . ................................................................ _..... <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY El99.OTHER(Specify): 490-3a. <br /> 490-3b. <br /> III. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,2634] 4904. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) that <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,2634] <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: Veeder-Root 490-7. MODEL#: TLS-350 490-8' <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 990- MODEL#(S): Liquid Sensor Series 794380409 490-10. <br /> ❑._.........................................................................................._...__..................._....._.._....................................__.._........................................................................_....---_._...----..................._....._.._......_......................................................................................................................................_.............................._._.........._........_........... _....2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§26431 a9o=Vii <br /> PANEL MANUFACTURER 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S). 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS DAILY/NIGHTLY c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER490-18. <br /> _ _ (Specify): 490-19. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION CCR§ ..... <br /> 2646_ij........._......._........_..__._.__....._............_._ .................._... . _._....490-20. <br /> ..............................._.........._.................................................._..-..................---.............................................................................................................................._..---...._.._.................................:............................_..._---........................................................................................................................................................................ <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§26451 TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-21. <br /> ...................................................................................................................................................................................................._.............................................................._.__...__..........--..................................................................................... 490-22. <br /> _ ..................................................._................__._._........................... ........... <br /> _._..22.........__. <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.1] 490-23. <br /> TEST FREQUENCY: ❑ a.ANNUALLY El b.BIENNIALLY El c.OTHER490-24. <br /> (Specify): 490-25. <br /> ❑ ...... <br /> ( P �) a90-27. <br /> 99.OTHER S eci <br /> 490-26. <br /> � <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) ("e" <br /> that apply) <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> [23 CCR SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ® c.PRESSURIZED 49429. <br /> §3 CC Q ❑ d.UNDER VACUUM <br /> PANEL MANUFACTURER:Veeder-Root 490-30. MODEL#: TLS-350 490.31. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490-31. MODEL#(S): Liquid Sensor Series 794380-208 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-35. <br /> _.........._......_............_..__.._........._.......................__�..__.......--......................................................................................................................_ .._.._........._._._................................................................................................._......_............................................................................................. <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.(23 CCR§2636] <br /> MLLD MANUFACTURER(S): 490-37 MODEL#(S): 490-38. <br /> ................_ .........................._....._.........................._._................................. ....._............._................................................................... .... <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR.(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§2636] 490-39. <br /> ELLD MANUFACTURER(S):Veeder-Root 490-40. MODEL#(S):PLLD Series 848480-003 490-41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490-42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-43. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES [Ib.NO 490-44. <br /> ...............................................-----...................._.........._...._...................-........._-.....................__._......................................................................................_............................._..-_-._.......- ....................................................................._.._.._.._......................................................................................................................... <br /> ❑ 4.PIPE INTEGRITY TESTING. 490-45. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS El c.OTHER(Specify) 44990 6. <br /> ❑ 5.VISUAL PIPE MONITORING.........................................................................._,_.._......... _........_.__..._.. -............. , ...._......._....__.......................__.._.._................................................ 490-48..... <br /> 47. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 49049. <br /> *Allowed for monitorin of unburied emer enc enerator fuel i in onl er HSC 25281.5 3 <br /> -...................._-....._......._................. ................. ......................................._&........X..B.................._. P P&__....Y..P......................§..................... H...)........................... <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(x)(3)] 490-50. <br /> .. <br /> ......................................................................_...............................-.......................... <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> ..............................----......................_..-....._..........__...__..........................................................................................-............. <br /> ❑ <br /> 99.OTHER(Specify) 490-sz. <br /> 490.53. <br />