Laserfiche WebLink
FIED PROGRAM CONSOLIDATED F09 <br /> * UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Page 1 of 2) <br /> TYPE OF ACTION ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-1. <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1. <br /> BUSINESS NAME(Same as Facility Name or DBA) 3. <br /> Chevron Station#209167 <br /> BUSINESS SITE ADDRESS 1234 Yosemite Ave 103. CITY Manteca, CA 95336 104. <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> b the a ui ment manufacturers'instructions,or annually,whichever is more frequent.Such work must be performed b ualified ersonnel.[23 CCR§2632,2634,2638,26411 <br /> X...................9......P.........._.................................................................................................__...........................__........................_.__...._................................__9...................._.._.._._........................---.._.................................................._Y...9...................................................__-............_...--.._..... -....._....................... <br /> MONITORING E UIPMENT IS SERVICED ® 1.ANNUALLY El99.OTHERS eci 490-3a. <br /> Q ( p �)' 490-36. <br /> III. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,2634] <br /> 490-4. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> (Check <br /> ack 111 <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,2634] <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: Veeder-Root 490-7. MODEL#: TLS-350 490-8. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490 MODEL#(S): Liquid Sensor Series 794380409 490-10. <br /> _............_........._..............--._..............................................................................................................................-.....................-._.._.............._......_._.__...._.......... - -- .._..................._............................................................................................_................................_.__ ---------- <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(Sl.[23 CCR§2643] 490--1-1-7. <br /> PANEL MANUFACTURER 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S). 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.C .DAILY/NIGHTLY U c.WEEKLY 490.16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHERS eci 490-18. <br /> g.p.h. g.p.h. (Specify): 490.19. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.1] 490-20. <br /> ................................................................................................._.................-- --.....-_..............._................_._.................................._.................................... <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§26451 TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-21. <br /> ..................._..........._...................................................._..__-.................._.................................................................................................._....................................... ...490.22. <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.1] 490-23. <br /> TEST FREQUENCY: ❑ a.ANNUALLY Elb.BIENNIALLY [I c.OTHERS eci 490-24. <br /> Q (Specify): .490-25. <br /> ❑ <br /> 99.OTHER(Specify): 49ago-26. <br /> 0-27. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> (Check ly) <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> [§2636]CCR SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ® c.PRESSURIZED ❑ d.UNDER VACUUM 490-29. <br /> PANEL MANUFACTURER:Veeder-Root 490-30. MODEL#: TLS-350 490-31. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490-32. MODEL#(S): Liquid Sensor Series 794380-208 490-33, <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. E a.YES ❑ b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-35. <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3.O g.p.h.1EXk TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§26361 <br /> MLLD MANUFACTURER(S): 490-37. MODEL#(S): 490-38. <br /> ..__....................._...............................................................................I........_..._....... ......................................................................................... .............................. <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§2636] 490-39. <br /> ELLD MANUFACTURER(S):Veeder-Root 490-40. MODEL#(S):PLLD Series 848480-003 490-41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490-42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 49043. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-44. <br /> -_-....-_ .. . . . . . . . . . _.. <br /> .............................---_.....................__..............................................._..__.................................-_.........._...--..._...........-_._............................................................................................................................................ ............_.....__._._............................................................................ <br /> ........................ <br /> j!�PIPE INTEGRITY TESTING. a9oas. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3.YEARS El c.OTHER(Specify) 49047.o6. <br /> -------...----._..__........................................................................................................................-.................__.-. <br /> ❑ 5.VISUAL PIPE MONITORING. 496-4s. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49. <br /> ...----'----'-'-'-'--_............ . ..... ....... ........................................................................ . . .. <br /> --_....................__-_._ <br /> __---•---F`llowed.for_monitoring.of unburi�emergency.generatorfuelpiping.onlyperHSC§2528L5(b3) _ <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(ax3)] 490-50. <br /> .......-.....................................-- -..........................................................................................._.._._..........................._._-_._..._ _.._..............................._....................................................................................................._.........................._........_........................................................................._-............................................... <br /> ............ <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. ago-sl. <br /> ..............._.................._.. ----._..........---..........._............................._.................................._.............._................................__..__..................._.-. <br /> _..............._..._.__._................................................................................................................... ...........2...... <br /> ❑ <br /> 99.OTHER(Specify) ago-s2. <br /> 490.53. <br />