Laserfiche WebLink
Work Order: 2250365 <br /> SWRCB,January 2002 page L of < <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES — — <br /> Facility is Not Equipped With S ilL�Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer <br /> Other(Spec y) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(Spec! ) <br /> Test Equipment Used: �� ��� �� ¢ iGcxsvrc Equipment Resolution: <br /> Spill Box# q Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter. " <br /> Bucket Depth: <br /> Wait time between applying 1 5- <br /> pressure/vacuum/water <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(IQ: <br /> Test End Time: <br /> Final Reading(RF): t Z <br /> 7)747, <br /> Test Duration: r <br /> Change in Reading(RF-Rt): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> k ra Y �.s ia�q,:M ,-.-- � ; <br /> 'y + tttt...t:..w ,a.}. ..• :C`•._ .=•_9aiawn� <br /> Comments—(include i3�n on repairs made prior to testing,and recommended follow-up forfafled tests) <br /> Tanknology Inc.8501 N.MoPac Expwy#400,Austin,Texas 78759 <br />