Laserfiche WebLink
Work Order: 2250365 <br /> SWRCB,January 2002 Page of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES K <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer <br /> Other(Spec!Vy.) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: .fa B Allez.rvrc Equipment Resolution: <br /> Spill Box# 9/ Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: ' <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 1/:00 1?,-- <br /> Initial <br /> ?.wInitial Reading /2 Yf" <br /> Test End Time: / Z :00 <br /> Final Reading(RF): t Z ' <br /> Test Duration: r <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or ) <br /> Criteria: 'fl6 <br /> Comments—(include!nLbrmadon on repairs wade prior to testln&and recommended follow-up for failed a <br /> Tanknology Inc. 8501 N.MoPac Expwy#400,Austin,Texas 78759 <br />