Laserfiche WebLink
19255517888 Main Fax GETTLER RYAN INC 1:05 a.m. 05-16-2007 3/3 <br /> r49 <br /> 1W <br /> SWRCB,January 2002 Page of L <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer <br /> Other(Specif;�) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used: pa grafi �a ¢ 1l�e�cts✓�6 Equipment Resolution: <br /> Spill Box# cj/ Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: Z" <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: / 1:00 QrInitial Reading(Rj): i Z %'*1+ <br /> Test End Time: I Z : o p <br /> Final Reading(RF): <br /> r Z <br /> Test Duration: r <br /> Change in Reading(RF-Ri): <br /> Pass/Fail Threshold or J " <br /> Criteria: <br /> 4`x <br /> `c� i�]IE � a1t, x" )E`�$ Fa�l�•. <br /> Comments—(include inormadion on repairs made prior to testing and recommended follow-up for failed tests) __ <br />