Laserfiche WebLink
• Work Order: 2243602 <br /> + F. In-Tank Garaging/SIR Equipment: U Check this box if tank gouging is used only for inventory control. <br /> D Check this boxx if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform teak detection roonitoring. <br /> Complete the following chteittlat: <br /> ayes d No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ® yes ® No" Were all tank,gauging probes visually inspected for damage and residue buildup? <br /> Cl Yes ❑ No' Was accuracy of system product level readings tested? <br /> p yes CI NOV Was accuracy of system water level readings tested? <br /> a Yes ® Ne Were all probes reinstalled properly? <br /> 4 Yes ® No" Were all it=s on the equipm at manufacturer's maintaaance checklist completed? <br /> *In the Section H,bele m,describe hflw and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ® Check this box it LLDs am W WsMiled. <br /> Cone plate the fullo+vin checklist: <br /> Yea ❑ No° For equipment 9131-01)or annual equiprnmt certification,was a teak simulated to verify 1.1.D perfmmanceY <br /> ® NIA (Check all rhw apply) Simulated lrak race: 3 g_p.h.; Cl 0.t g.p.b; ❑0.2 g p ln. <br /> Yes ❑ No' Were l LLDs confumed operational and accurate within ngulatoy requirements? ' <br /> Yea O NO Was the testing apparatus properly csblr%ed? <br /> D Yes t3 No* Formechanical LL.Ds,does the LLD restrict product flow if it detects a leak? <br /> IA <br /> Yes 1 ® Ne For electrunICUDs,does the turbine automatGiiy iiTst 7H if the LLD deeds a leak"! <br /> ❑ NPA <br /> Yes C3 ldo• For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring aystem is disabled <br /> C3 NIA or diKormectedP <br /> Yes D No• For electronic LLbj, does the turbine automatically shut off if any portion of the; monitoring System <br /> Ca N/A malfimcdOns or fails m tmf? <br /> Yes 13 No• For electronic LL1Ds,have all accessible wining connections been visually bopeetsU <br /> C3 NIA <br /> Yes ❑ No- Were all items m dto ecpniptnent mwwfachwer's rnaintm m w checklist complcw7 <br /> "In the Section H,below,describe how mad whom these deficiencies were or will be eorrectcd. <br /> H. Comments- <br /> Page 3 of 3 031aa <br /> Tanknology-NDE 8900 Shoal Creek,Building 200 Austin,Texas 78757 <br />