Laserfiche WebLink
onitoring System Certification <br /> Site Address: 1234 E.YOSEMITE AVE Date of Testing/Service: 03/03/2010 <br /> @ SPRECKLES <br /> F. In-Tank Gauging/SIR Equipment <br /> aCheck this box if tank gauging is used only for inventory control. <br /> ® Check this box if no tank gauging or SIR equipment is installed. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑X Yes ❑No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Q Yes ❑No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> E Yes ❑No* Was accuracy of system product level readings tested? <br /> EYes ❑No* Was accuracy of system water level readings tested? <br /> M Yes RN,- Were all probes reinstalled properly? <br /> Q Yes ❑No* Were all items on the equipment manufacturers'maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : ❑X Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> X Yes ❑No* ❑N/A (Check all that apply)Simulated leak rate: X 3 h 0.1 h 0.2 h <br /> ❑ g•p• ❑ 9•P• ❑ g•p• <br /> FX-1 Yes ❑No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> [71 Yes O No* Was the testing apparatus properly calibrated? <br /> ❑Yes ❑No* ❑N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> M Yes ❑No* ❑N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> M Yes ❑No* ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ❑Yes [:]No' ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> 0 Yes ❑No* ❑N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> LJ Yes ❑No* Were all items on the equipment manufacturers'maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 Based on CA form dated 03/08 <br />