Laserfiche WebLink
Onitoring System Certification <br /> Site Address: 1234 E.YOSEMITE AVE Date of Testing/Service: 03/20/2009 <br /> @ SPRECKLES <br /> F. In-Tank Gauging /SIR Equipment <br /> ❑R Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑Yes ❑No• Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑Yes ❑No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes ❑No• Was accuracy of system product level readings tested? <br /> ❑Yes FN.' Was accuracy of system water level readings tested? <br /> El YesPEOW <br /> No• Were all probes reinstalled properly? <br /> E]Yes Were all items on the equipment manufacturers'maintenance checklist completed? <br /> .In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ❑X Yes ❑No' E]N/A (Check all that apply)Simulated leak rate: Q 3 g.p.h❑0.1 g.p.h ❑0.2 g.p.h <br /> Yes Q No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑x Yes ❑No• Was the testing apparatus properly calibrated? <br /> ❑Yes ❑No• 0 N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> M Yes ❑No• ❑N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑x Yes ❑No• ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ❑x Yes ❑No• ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> Yes ❑No` ❑N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> Yes I❑No> Were all items on the equipment manufacturers'maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> 87 LD TO MUCH RESILIENCY WASN'T ABLE TO REMOVE THE SIPHON JET AS THE PLUG WAS STRIPPED. <br /> Page 3 of 3 Based on CA form dated 03/01 <br />