My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1234
>
2300 - Underground Storage Tank Program
>
PR0516248
>
COMPLIANCE INFO_2015-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2023 11:28:32 AM
Creation date
6/3/2020 10:00:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015-2018
RECORD_ID
PR0516248
PE
2361
FACILITY_ID
FA0012532
FACILITY_NAME
CHEVRON STATION #209167
STREET_NUMBER
1234
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22120016
CURRENT_STATUS
01
SITE_LOCATION
1234 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0516248_1234 E YOSEMITE_2015-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer 0 Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum El Hydrostatic <br /> ✓❑Other(Spec) Inches, 1 hr visual test <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: nches.,hr visual tss <br /> Spill Box#87 Fill Spill Box#91 Fill Spill Box#87 Vapor Spill Box#91 Vapor <br /> Bucket Diameter: 12" 12" 12" 12" <br /> Bucket Depth: 14" 15.25" 14.5' 15.5" <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes 15 minutes <br /> starting test: <br /> Test Start Time: 8:42am 8:42am 8:42am 8:42am <br /> Initial Reading(RI): 12.5 Inches,,hr visual test 13.5 Inchas.,hr visual test 13.25 Inches.,hr visual teat 14.5Inch..,I hr visual <br /> Test End Time: 9:42am 9:42am 9:42am 9:42am <br /> Final Reading(RF): 12.5 Inches.,hr visual lest 13.5 Inches.,hr visual test 13.25 Inches.l hr-W test 14.5 Inches,t hrvi...It, <br /> Test Duration: 1 Hr. 1 Hr. 1 Hr. 1 Hr. <br /> Change in Reading(RF-RI): 0 0 0 0 <br /> Pass/Fail Threshold or 0.002 0.002 0.002 0.002 <br /> Criteria: <br /> Test Result: ®Pass ❑Fail �]✓. Pass ElFall Q✓ Pass ❑Fail0Pass. []Fail', <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> "'Di0 <br /> AR 3 0 2017 <br /> VROWfEE'° 5-1,L HEALTH <br />
The URL can be used to link to this page
Your browser does not support the video tag.