My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1234
>
2300 - Underground Storage Tank Program
>
PR0516248
>
COMPLIANCE INFO_2015-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2023 11:28:32 AM
Creation date
6/3/2020 10:00:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015-2018
RECORD_ID
PR0516248
PE
2361
FACILITY_ID
FA0012532
FACILITY_NAME
CHEVRON STATION #209167
STREET_NUMBER
1234
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22120016
CURRENT_STATUS
01
SITE_LOCATION
1234 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0516248_1234 E YOSEMITE_2015-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F.In-Tank Gauging/SIR Equipment: r Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> M Yes No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> M► Yes f' No* Was accuracy of system product level readings tested? <br /> G, Yes No* Was accuracy of system water level readings tested? <br /> Yes G' No* Were all probes reinstalled properly? <br /> ja Yes r No* ere all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> G' Yes '^^ No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance?(Check all that <br /> rN/A <br /> app/y)Simulated leak rate:F 3 g.p.h.; � ; <br />
The URL can be used to link to this page
Your browser does not support the video tag.