Laserfiche WebLink
0 <br /> SWRCB,January 2002 Page C of 7 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: U Sump Manufacturer U Industry Standard rofessional Eugineer <br /> U Other(Sped ) \ <br /> Test Method used: U Pressure U Vacuum y� <br /> f efy) <br /> Test Equipment Use& tAw etl r�a 4c,,,,- <br /> Sump-#-1— <br /> a,✓ Egtripme�t Resolution: Gr r�(e '��`{B��t <br /> Sump#� Sump# 2 sump# Sump# <br /> Sump Diameter q <br /> Sump RT�x IT <br /> Sump MatecisL• i�S S <br /> height from Tank Top to Top of <br /> Hi Penetration: <br /> Height from Tank Top to Lowest <br /> Mectrival Penetration: <br /> Condition of sump prior to te*tin : Y r v <br /> Portion of Sump Tested' tAh4Y Gni „' `� u,?a--e-v Ltvt(,z.),,,' WA �v t,r,►t, ! °' <br /> Does turbine shut down when es U No u NA <br /> sump sensor detects liquid(bothf I'es U No UNA Yes U No U NA UY . U No UNA <br /> roduct and wa,dcr e <br /> Turbwe shutdown response tinge <br /> Is system programmed for fait-safe Ye$ U No U NA m U No UNA Yes U No UNA U Ys U No UNA <br /> Was verified to be es U Nfl U NA <br /> o ?4 es U No UNA ­ $,Yes U No .0 NA U Y U No UNA <br /> Wait time between applying <br /> pressuretvacuuw rvat�r"Ind starting <br /> test �o ,� 1a drrr5. 5 <br /> Test Start Time: ' v U <br /> 30 <br /> Initial heading <br /> Test End Time. d s { liDd sGU <br /> Final Reading(Ri) 1 t v G> <br /> �r rj--Gr <br /> Test Duration., <br /> Change in Reading(Rs-Rt) N r/G lUo G N u r � <br /> Bit Threshold or Criteria: Gryr-lea 3 Ute-= L Gnat-1 .,,�DIw» �r 3ar <br /> Was sdusor removed for testing?7yeessUNo UNA UNo U NA es U No U NA U Y UNo UNA <br /> Was sensarPreP�Y ffid U No verified functional atU!Aes UNo UNA 1�I'es UNo UNA U es UNo UNA <br /> tes testin ? <br /> Comments—Creclude izzjorntaSon on repairx mardepr�or to tert �acrdrecxi folloxs+-un for a�'led tests) <br /> 'If the entire depthof the sump is not tested,specify how much was tested. If the answer to W of the questions indicated with an <br /> asterisk(*)is"NW or"NA-1 the entire sump must be tested. (See SWRCB LO-I60) <br />