Laserfiche WebLink
Monitoring System Certification 0 <br />F. In -Tank Gauging / SIR Equipment: 0 Check this box if tank gauging is used only for inventory control. <br />0 Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />0 Yes 0 No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />0 Yes 0 No* Were all tank gauging probes visually inspected for damage and residue buildup? <br />0 Yes 0 No* Was accuracy of system product level readings tested? <br />0 Yes 0 No* Was accuracy of system water level readings tested? <br />0 Yes ❑ No* Were all probes reinstalled properly? <br />0 Yes 0 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />*In Section H, below, describe how and when *h-- <br />-_-- I-- -."Ann LM %;Uffuccteu. <br />G. Line Leak Detectors (LLD): 0 Check this box if LLDs are not installed. <br />0 -■ <br />N <br />,ing checklist: <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />(Check all that apply) Simulated leak rate: 0 3 g.p.h.; 0 0.1 g.p.h ; El 0.2 g.p.h. <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Was the testing apparatus properly calibrated? <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />or disconnected? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />or fails a test? <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H, below, describe howand­when these d_efi�cie`=cies were or will be corrected. <br />H. Comments: <br />UN -036 — 3/4 <br />Page 3 of 4 <br />-wW-Unidoes.org <br />Rev. 01/17/08 <br />