My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3304
>
2300 - Underground Storage Tank Program
>
PR0516354
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 2:01:45 PM
Creation date
6/3/2020 10:00:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0516354
PE
2361
FACILITY_ID
FA0012437
FACILITY_NAME
CHEVRON 352324
STREET_NUMBER
3304
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
07120013
CURRENT_STATUS
01
SITE_LOCATION
3304 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0516354_3304 W HAMMER_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page -3 of - <br />Test Method Developed By: RPiping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: Z Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used 'r e 5 5'CC� u 9 e5 � ,t � � � � <br />Equipment Resolution: <br />Piping Run # Piping Run # <br />Piping Material: ; (� & <br />Piping Manufacturer: <br />Piping Diameter: r <br />Run # 3 Piping Run #�_ <br />Length of Piping Run: <br />5-0' <br />i <br />/ <br />. /rr <br />` 1 i <br />Product Stored: <br />' e I w.(4L r <br />Method and location of <br />6 . { <br />-f <br />piping -run isolation: <br />W ' d a between applying <br />u. �. 3 <br />C R 5 c� m' ! +Z <br />ss /vacuumlwater and <br />starting test: <br />/ � <br />u 1 - <br />Test Start Time: <br />�3 . 30 <br />g <br />2.vj <br />v <br />Initial Reading (RJ: <br />5P5. <br />Test End Time: <br />4 v <br />3 <br />v <br />Final Reading (RF) <br />Test Duration: <br />Change in Reading (RF-Rj): <br />' <br />Pass/Fail Threshold or <br />Criteria: <br />p'�' <br />l Y o 5 8 C si ,T5 <br />7 V d s .S <br />S� ✓'t <br />Test <br />Teat ReSUIt: <br />Pass ❑ Fall <br />,"Pass - ❑ Fall <br />9 Pass ❑Fail <br />Pass ❑ Fall <br />Comments — (include information on repairs made <br />prior to testing, and recommended ollow up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.