Laserfiche WebLink
NNGYST C T ATS CC � �I.� EDD <br />(Ise By , tU Jurisdictions 14,71hin the State of C'a carnia <br />l nthorily C'itecl: C'haj.?Ier 6.7, f earth ancf .Safefi Code; Chapter 16, Dig inion 3, Title 23, California Y a� c Ir�{{���yy <br />qft 9ns <br />This form must be used to document testing and servicing of monitoring equipment. Ase crate certification r&i�e <br />St <br />PH. for each monitoring system control panel by the technician who performs the work. A copy 1the tank system owner/operator. _ The owner/operator must submit a copy of this form to the local aged)' stems <br />within 30 clays of test clate�` �i > <br />A. General Information <br />Facility Name: 11,911, /Vido <br />Bldg, <br />�'r No.: <br />Site Address: s'f�c/ /�%�J,�»//""City: ,C �Zip: <br />Facility Contact Person: LA,,) Contact Phone No.: ( ) <br />Make/Model of Monitoring System: V/0. jos Date of Testing/Servicing: <br />B. Inventory of Equipment Tested/Certified <br />Check the appropriate boxes to indicate snecific enninment incnorto,voo ,: d. <br />T nk ID: 0c <br />In -Tank Gauging Probe, Model: <br />Tank ID:f>Se.- <br />AMW <br />a <br />Panular Space or Vault Sensor. Model: <br />In -Tank Gauging Probe. Model:. %�•- _ <br />, <br />Annular Space or Vault Sensor. Model: — <br />iping Sump / Trench Sensor(s). Model: <br />❑ Fill Sump Sensor(s). <br />TL.CJ <br />Piping Sump / Trench Sensor(s). Model: �U' <br />Model: <br />Mechanical Line Leak Detector. Model: L <br />❑ Electronic <br />❑ Fill Sump Sensor(s). Model: _ <br />Mechanical Line Leak Detector. Model:' <br />Line Leak Detector. Model: <br />❑ Tank Overfill / High -Level Sensor. Model: <br />❑ Electronic Line Leak Detector. Model: <br />❑ Other (s ecify e ui ment type and model in Section E on Pa a 2). <br />❑ Tvilc Overfill / High -Level Sensor. Model: <br />❑ Other (s ecify equipment ty a and model in Section E Pa <br />T. nk ID: ° t <br />on a Z). <br />Tank ID: <br />nkTank <br />In -Tank Gauging Probe. Model: %%ji�(i / <br />❑,_,�r Annular Space or Vault Sensor. Model: <br />❑ Gauging Probe. Model: <br />,Ia Piping Sump / Trench Sensor(s). Model: <br />❑ Annular Space or Vault Sensor. Model: <br />❑ Piping Sump / Trench Sensor(s). Model: <br />❑ Fill Sump Sensor(s). Model: <br />Mechanical Line Leak Detector. Model:Vh��� <br />❑ Fill Sump Sensor(s). Model: <br />❑ Mechanical <br />Electronic Line Leak Detector. Model: <br />Line Leak Detector. Model: <br />❑ Electronic Line Leak Detector. <br />ank Overfill / High -Level Sensor. Model: <br />ther (specify equipment ty a and model in Section E on Page 2). <br />Model: <br />❑ Tank Overfill / High -Level Sensor. Model: <br />❑ Other (specify !21 i meat t e and model in Section E on <br />LDispenser ID: Z_ a. <br />ispenser Containment Sensor(s).Model: <br />Dispenser ID: 7 <br />❑ <br />hear Valve(s)' <br />ispenser Containment Sensor(s). Model: <br />'hear <br />is censer Containment Float(s) and Chain(s). <br />Valve(s). <br />nser Containment Floats) and Chain(s). <br />DispeDispenser <br />Dispenser ID: �-- y <br />ID: <br />❑ Dispenser Containment Sensor(s). 'Model: <br />❑ Dispenser Containment Sei or Model: <br />hear Valve(s). <br />❑ Shear Valve(s). <br />Dis enser Containment Floats) and Chain(s). <br />❑Dis enser Containment F at(s) id Chain(s). <br />Dispenser ID: � <br />Dispenser 1D: <br />ispenser Containment Sensor(s). Model: <br />Shear Valve(s)' <br />L3 Dispenser Containment Sen r(s). Model: <br />g❑ <br />Dis enser Containment Float(s) and Chain(s). <br />❑Shear Valve(s). <br />❑Dis Dispense Containment Floats and Chain(s). <br />If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility. <br />C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the <br />manufacturers' guidelines. Attached to this Certification is information (e.g. <br />manufacturers' checklists) necessary to verify that this <br />information is correct and a Plot Plan showing the layout of monitoring equipment. For any equ�ipqsent capable of generating such <br />reports, I have also attached a copy of the report; (check all that app&): S stem set -u <br />Technician Name (print): y Alartrt history report <br />(p ) AVi�,� lC% <br />�,�1 t•st r,®" <br />Signator : i <br />Certification No.: XV75L° <br />'F 52 ✓73-41r <br />License. No.: ` j!j7r <br />/) <br />Testing Company Name: / m0 r z A 5,7 <br />Phone No.:( Zt r %'��%, 41//Z <br />Site Address.- 3��t/ �,? /.'YJ�JtA� G,f <br />Date of Testing/Servicing: /27/ 0J- <br />Monitoringn Systeaq, Certification s Pare I ol'3 <br />_ 03/01 <br />D. .Resiiuks ttt° E e4,,t su�A / yeu'c acil��; <br />