Laserfiche WebLink
F. In -Tank Gau Jing / SIRE ment: <br />Check this box if tan. 1111 <r <br />mina is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />f nm n1pto the fn19_-iwin.r ri,ae►y9 eek• <br />❑ Yes <br />I ❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): <br />Camnlete the fnllnwinu Apeklict- <br />❑ Check this box if LLDs are not installed. <br />H. <br />❑ No* <br />❑ N/A <br />(Check all that apply) Simulated leak rate g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />For equipment start-up or annual equipment ertification, was a leak simulated to verify LLD peIdisabled <br />F <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />❑ No* <br />❑ N/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ o* <br />1,0 N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ Yes <br />❑ o* <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />or disconnected? <br />❑ Yes❑ <br />legN/A <br />o* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />malfunctions or fails a test? <br />❑ Yes <br />❑ o* <br />N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section <br />H. <br />-____ <br />below. describe how Ind whan _ ------ <br />H. Comments: <br />Page 3 of 3 <br />03/01 <br />