Laserfiche WebLink
North America Job Hazard Analysis <br /> ERMField Office Work <br /> Project Name: John Deere Landscapes (Former LESCO Facility) <br /> Project Number: 0129740 <br /> Job/Task Name: Field Office Work <br /> JHA No.: 1 <br /> Task Step Hazard Control Measures <br /> Computer Work Poor workstation arrangement and/or not taking Follow ERM guidance for workstation arrangement presented <br /> sufficient breaks can contribute to ergonomic in the"ERM Safety Program Introduction." Highlights of this <br /> injuries. guidance include positioning computer monitors at or below <br /> eye level,using chairs that fit your body and have adjustable <br /> armrests,and keeping the mouse close to the keyboard. <br /> The most important thing you can do to avoid ergonomic <br /> injury is to take at least a 5-minute break every hour and <br /> stretch or move around the office. <br /> Preparing for Emergencies Poor preparation for fires,evacuations,and other Fire extinguishers should be installed as required by local <br /> occurrences may increase the likelihood of regulations. They should be visually inspected at least <br /> significant injury or fatalities. monthly and checked to ensure that the needle is in the green. <br /> They should also be serviced as recommended by their <br /> manufacturer(typically annually). Employees must be <br /> trained in the use of fire extinguishers. <br /> In general,chemicals should not be stored in office trailers. If <br /> necessary,flammable chemicals must be stored inside <br /> flammable storage cabinets and incompatible chemicals must <br /> be stored away from each other. <br /> A well-stocked first aid kit should be kept in a well-marked <br /> area of the field office,inspected and restocked at least <br /> monthly. Emergency phone numbers should be posted <br /> nearby. At least one employee should be trained in First <br /> Aid/CPR. <br /> Emergency drills must be practiced annually,and should be <br /> documented on the"Evacuation Drill Evaluation Form." <br /> ERM Remediation&Construction Management 3 Form Rev.:05-08 <br />