Laserfiche WebLink
s North America Job Hazard Analysis <br /> ERM Work in Undeveloped, Remote, or Inactive Sites <br /> Project Name: John Deere Landscapes(fonner LESCO Facility) <br /> Project Number: 0129740 <br /> Job/Task Name: Work in Undeveloped,Remote,or Inactive Sites <br /> JHA No.: 3 <br /> Document Routing <br /> FSO Retain copy in site health&safety file,amend to HASP as necessary. <br /> Project Manager Retain copy in the office health&safety file,amend to HASP as necessary. <br /> Instructions: This JHA has been developed and approved by the North America Safety Team. Prior to conducting fieldwork. <br /> site-specific hazards related to this task must be incorporated by the project team. Once completed,the JHA <br /> should be reviewed regularly with site personnel who will be performing this task. <br /> Task Description: <br /> General guidelines for working safely in locations that are inactive,remote, or undeveloped. <br /> Hazard Analysis: <br /> Task Step Hazard Control Measures <br /> Plan ahead for the site visit Operational and safety items unplanned for prior to Know ahead of time where any specific parking and entry <br /> visiting the site can cause significant delay. locations are,as well as training or drug testing required prior <br /> to site entry. Ask your site contact/escort to explain any pre- <br /> entry requirements. <br /> Have the following personal protective equipment with you <br /> and wear it while working: <br /> • Steel-toe boots <br /> • Long pants <br /> • Safety glasses <br /> • Hard hat <br /> • Safety goggles (if splash hazards exist) <br /> • Chemical resistant gloves (if needed) <br /> Assess the need for foul-weather gear and include it in <br /> materials procured for working at the site. <br /> ERM North America 1 Form Rev.:05-08 <br />