My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2829
>
2300 - Underground Storage Tank Program
>
PR0536714
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 7:10:12 PM
Creation date
6/3/2020 10:00:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0536714
PE
2361
FACILITY_ID
FA0011261
FACILITY_NAME
LESCO INC
STREET_NUMBER
2829
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14502013
CURRENT_STATUS
02
SITE_LOCATION
2829 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0536714_2829 W WASHINGTON_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
North America Job Hazard Analysis <br /> ERM <br /> ERM Actions During Subsurface Clearance and Drilling <br /> Project Name: John Deere Landscapes(Former LESCO Facility) <br /> Project Number: 0129740 <br /> Job/Task Nance: ERM Actions During Subsurface Clearance and Drilling <br /> JHA No.: 4 <br /> Task Step Hazard Control Measures <br /> Inspect Each Ground Inexperienced people conducting inspection may The"SSC Experienced Person'must lead inspection of each <br /> Disturbance Location miss pertinent information regarding utilities Ground Disturbance Location. Any visual clues of subsurface <br /> and/or services. obstruction/utilities should be documented. Critical zones <br /> may have to be reassessed at this point. Use the SSC Checklist <br /> to document this inspection for each point inside a critical <br /> zone,at a minimum. <br /> Finalize Critical Zone Not performing this verification step in the field Use information gathered during pre-planning,utility <br /> Determinations may lead to a SSC strike. markout,and site walk/inspection to verify critical zones that <br /> have been previously established. Revise critical zones as <br /> necessary. Use the SSC Checklist to document points inside <br /> critical zones. <br /> If points are confirmed inside critical zones,either step out <br /> and relocate the ground disturbance location,or contact the <br /> PIC for additional guidance. <br /> Oversee setup of drilling Overhead electrical/other lines may come in contact Ensure drill rigs are set up in areas where they will not contact <br /> equipment with drill rigs. overhead lines when being positioned. The minimum <br /> distance for drill rig clearance is 25 feet unless special <br /> permission is granted by the utility company. When a drill rig <br /> must be maneuvered in tight quarters,the presence of a <br /> second person is required to ensure adequate clearance. If <br /> backing-up is required,two ground guides will be used:one <br /> in the direction the rig is moving and the other in the <br /> operator's normal field of vision. <br /> Materials stored in the vicinity of drill rigs may pose Move tools,materials,cords,hoses,and debris to prevent trip <br /> various hazards to employees. hazards and contact with moving drill rig parts. Secure tools <br /> and equipment subject to displacement or falling. Store any <br /> flammable materials away from ignition sources and in <br /> a roved containers. <br /> ERM North America 3 Form Rev.:05-08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.