My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2829
>
2300 - Underground Storage Tank Program
>
PR0536714
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 7:10:12 PM
Creation date
6/3/2020 10:00:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0536714
PE
2361
FACILITY_ID
FA0011261
FACILITY_NAME
LESCO INC
STREET_NUMBER
2829
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14502013
CURRENT_STATUS
02
SITE_LOCATION
2829 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0536714_2829 W WASHINGTON_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
North America Job Hazard Analysis <br /> ERM ERM Actions During Subsurface Clearance and Drilling <br /> Project Name: John Deere Landscapes(Former LESCO Facility) <br /> Project Number: 0129740 <br /> Job/Task Name: ERM Actions During Subsurface Clearance and Drilling <br /> JHA No.: 4 <br /> Task Step Hazard Control Measures <br /> Complete Drilling Operations Equipment allowed to remain running poses pinch- Shut down drill rigs before repairing or lubricating parts <br /> point and potential explosion hazards to employees. (except those that must be in motion for lubrication). Shut <br /> down mechanical equipment prior to and during fueling <br /> operations. When refueling or transferring fuel,containers <br /> and equipment must be bonded to prevent the buildup of <br /> static electricity. <br /> Personal Protective Equipment Re uired for this Task: <br /> Type Description <br /> Insulated hand-augers Hand-augers fitted with rubber handles,or other non-conductive material. <br /> Training Required for this Task: <br /> Type Description <br /> SSC Classroom Training Initial classroom training detailing the ERM subsurface clearance process, tools, and forms. <br /> SSC Experienced Person At least one must be present on all sites involving SSC. The Experienced Person will both give SSC <br /> expertise in project execution and mentor less experienced employees. <br /> Forms Associated with this Task: <br /> Type Description <br /> SSC Checklist Checklist detailing the ERM SSC process, and providing tools to ensure critical zones and excavation <br /> buffers are properly identified and validated in the field. <br /> SSC Mentorship Card The SSC Mentorship Card provides Experienced Persons with topics to be covered with less <br /> experienced employees on SSC sites,and also documents mentoring of the less experienced employees. <br /> Daily Drill Rig Inspection Form Form required to be used by ERM subcontractors to document daily inspection of drill rigs. This form <br /> should be provided by the drill rig operating company. Completed forms should be kept with the <br /> ERM North America 5 Form Rev.:05-05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.