Laserfiche WebLink
Site Name: <br /> Subsurface Clearance Client:ERM p <br /> Field Process Checklist. ERM Project No.: <br /> SSC Exp.Person: <br /> Pro'ect Basics Yes No N/A Comments <br /> Contact Person requested and identified <br /> Subcontractors meet ERM's minimum safety criteria <br /> Subcontractors understand their role in the SSC Process <br /> SSC Experienced Person with current SSC training assigned <br /> Project staff with current SSC training assigned <br /> UXO/MEC risks assessed: UXO/MEC IS NOT present <br /> General Field Activity&Site Walk Yes No N/A Comments <br /> HASP read,understood and signed by project team <br /> Site walk Visual Clues /site features below integrated into Site Services Model <br /> Identified Visual Clue Yes No Identified Visual Clue Yes No <br /> Lights Pipeline markers <br /> Signage Fire hydrants <br /> Sewer drains/cleanouts Sprinkler systems <br /> Cable markers Water meters <br /> Utility poles with conduit leading to the ground Natural gas meters <br /> Utility boxes UST fill ports and vent pipes <br /> Manholes Steam lines <br /> Pavement scarring Remote buildings with no visible utilities <br /> Comments/Others: <br /> Contact Person Approval of Ground Disturbance Locations indicate verbal approval by printing"Verbal"in the signature sace <br /> Name Print Company Name Sin Date/Time <br /> Pre-Clearance Yes No N/A Comments <br /> Public Utility Markout completed <br /> Private Utility Markout completed <br /> Final Critical Zone determinations made by the SSC Experienced Person <br /> Critical Zones <br /> Are there any ground ❑ Yes. PIC must approve work within the Critical Zone. The SSC Location Disturbance Permit or equivalent <br /> disturbance locations is required for those locations. <br /> known or suspected to ❑ No. Physical Clearance will proceed to the deeper of: 0.6m/2 feet below the frost line or 1.2m/4 feet <br /> be inside Critical Zones? below ground level,whichever is deeper. <br /> Cleararicefor Point Disturbances Yes No N/A Comments <br /> Adequate overhead clearance at ground disturbance locations <br /> There are disturbance locations known or suspected to be inside Critical Zones <br /> Physical Clearance successfully completed at all locations <br /> Clearance,fpf Excavations Yes No NIA Comments <br /> Adequate overhead clearance at ground disturbance locations <br /> Communicate excavation plan and Excavation Buffer locations to subcontractor <br /> There are disturbance locations known or suspected to be inside Critical Zones <br /> De-energize below ground services prior to beginning excavation <br /> SSG.Process C©m`feted 6y SSC Experienced Person <br /> Name Print Name Sin Date/Time <br /> ERM Health&Safety Page 1 of 1 Last Rev: Sept.2009 <br /> English Version <br />