Laserfiche WebLink
Site Inspection <br /> ERM Checklist <br /> Project Name: <br /> Project Number: <br /> Inspector/Project Role: <br /> Date/Time: <br /> Heavy Equipment <br /> Observation Yes No N/A Comments <br /> Are daily equipment inspection <br /> checklists completed? <br /> Are safety deficiencies immediately <br /> repaired or has the equipment been <br /> taken out of service? <br /> Do the back-up alarms work? <br /> Does the operator use three-points <br /> of contact when getting on/off <br /> equipment? <br /> Is heavy equipment operated <br /> within its design capacity? <br /> Is equipment operated at safe <br /> speeds for site conditions? <br /> Are fire extinguishers present and <br /> in good working order on all <br /> equipment? <br /> Are keys or control panels removed <br /> when equipment is not in use? <br /> Are workers working with or near <br /> heavy equipment operations <br /> wearing high visibility clothing(i.e. <br /> traffic vest? <br /> ERM North America 6 Rev.Date 10-09 <br />