Laserfiche WebLink
City of Lathrop <br /> ESCP Worksheet <br /> Rev 1010912018 <br /> 4.3 Temporary Sediment Control BMPs <br /> opportunity1 S(AITTlent control is accomplished by two ways. First,pivinE sediment every <br /> runciff whilestill on the project. Secand, rernovesedinient frombeen <br /> • or tracked off sito beforedrains. <br /> control. t feet of • • <br /> rack out or • onto rtiun:cipal property must be removed • • • On • <br /> helow and on the stte nIdp Shmv howyou • project. <br /> CASQA BMP Describe the BMP to be implemented. <br /> Fact BMP Name Selected? <br /> Sheet (Check Box) If not used,state the reason why. <br /> SE-1 Temporary Silt Fence .arq.o..aemsn�rypo,.sr vd s... m..,•o.nyro <br /> SE-2 or Sediment basin or trap(all or some of the storm water drains to a <br /> SE-3 retention pond or basin where sediment can settle out) J1 Water will be contained with a trough for drilling <br /> SE-5 Temporary Fiber Rolls/Straw Wattles M .=.M.Ma+d�a�•+�••--•�.���•�. <br /> SE-6 or Temporary Gravel Bag Berm or Sand Bag Barrier <br /> $E•8 AMaobubea.od"f be cantaM+eO by the amng Ncr str <br /> �G•naw D•hs <br /> SE-7 Street Sweeping(inspect roads and sidewalks daily and sweep as No work in or around streets or sidewalks <br /> necessary) <br /> Lathrop Curb cutback(maintain a minimum of 4 Inches of elevation Work is not being performed on a <br /> Standard difference between the disturbed soil and the top of the existing curb, sidewalk, or paved surface <br /> curb,sidewalk,or paved surface) <br /> 5E-10 Temporary Drain Inlet Protection(mandatory for any DI's within <br /> Thera are no Dls within 50 feet of the project <br /> 50 feet of the project) <br /> 5E-13 Compost Socks/BiofilterBags rn.—ida.a —w-b.—tnn.e.nb.natv•n.bw.m.tosrd. <br /> Lathrop Stabilized Construction Exit—Constructed with aggregate at the traffic into and out of the site will <br /> Standard project owner's specification.but it must be effective in be minimized to prevent track out. <br /> controlling trackout. <br /> TC-2 Stabilized Construction Roadways ✓ Work is planned outside the roadway <br /> WM•O3 Stockpile Management(stockpiles that have not been actively Any soil produced from the <br /> used in the last 14 days must be covered with an erosion control borehole will be containerized <br /> blanket or plastic sheeting and contained with a fiber roll or gravel <br /> bag berm) in a roll off bin on site. <br /> 8 <br />