My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2900 - Site Mitigation Program
>
PR0543548
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 11:15:53 AM
Creation date
6/3/2020 10:30:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0543548
PE
2960
FACILITY_ID
FA0024728
FACILITY_NAME
SUPER STORE INDUSTRIES LATHROP DISTRIBUTION CENTER
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19816026
CURRENT_STATUS
01
SITE_LOCATION
16777 HOWLAND RD
P_LOCATION
07
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
830
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> I. INTRODUCTION....................................................................................................................1 <br /> 2. HYDROGEOLOGIC CONCEPTUAL SITE MODEL............................................................2 <br /> 2.1 Geology...........................................................................................................................2 <br /> 2.2 Groundwater Flow...........................................................................................................2 <br /> 2.3 Sulfolane..........................................................................................................................3 <br /> 2.4 Data Gaps Identified Based on CSM Review.................................................................3 <br /> 3. OBJECTIVES AND RATIONALE.........................................................................................4 <br /> 4. INVESTIGATION IMPLEMENTATION...............................................................................6 <br /> 4.1 Pre-Field Activities..........................................................................................................6 <br /> 4.2 Investigation Activities....................................................................................................6 <br /> 4.2.1 Drilling and Geologic Logging...........................................................................6 <br /> 4.2.2 Grab-Groundwater Sampling..............................................................................7 <br /> 4.2.3 Monitoring Well Installation...............................................................................7 <br /> 4.2.4 Monitoring Well Development ...........................................................................8 <br /> 4.2.5 Monitoring Well Sampling..................................................................................8 <br /> 4.2.6 Equipment Decontamination and Investigation-Derived Waste.........................9 <br /> 4.2.7 Surveying.............................................................................................................9 <br /> 5. SCHEDULE AND REPORTING ..........................................................................................10 <br /> 6. REFERENCES.......................................................................................................................I l <br /> LIST OF FIGURES <br /> Figure 1: Site Location Map <br /> Figure 2: Proposed Soil Boring Locations <br /> Figure 3: Generalized Stratigraphy Layering West to East with Sulfolane <br /> Figure 4: Deep Sand and Gravel Layer <br /> Figure 5: Hydrographs <br /> Site Characterization Work Plan ii June 22,2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.