Laserfiche WebLink
Geosyntec ° 3043 Gold Canal Drive,Suite 100 <br /> Rancho Cordova,CA 95670 <br /> PH(916)637-8048 <br /> consultants www.geosyntec.com <br /> Site Characterization Work Plan Fourth Addendum <br /> Date: 5 March 2019 <br /> To: Sid Sewalia, Central Valley Regional Water Quality Control Board <br /> From: Nicole Gotberg P.G., Geosyntec Consultants Inc. <br /> Scott Forbess P.E., Geosyntec Consultants, Inc. <br /> Subject: Site Characterization Work Plan Fourth Addendum, Former Occidental <br /> Chemical Corporation—Lathrop Facility <br /> Geosyntec Consultants, Inc. (Geosyntec) has prepared this Fourth Addendum to the Site <br /> Characterization Work Plan (Work Plan) on behalf of Glenn Springs Holdings, Inc (GSH), for the <br /> Former Occidental Chemical Corporation (OCC) Lathrop Facility (Site) in Lathrop, California. <br /> The Work Plan was submitted on 22 June 2018 and approved by the Central Valley Regional <br /> Water Quality Control Board (CVRWQCB) on 27 June 2018. Fieldwork for the Site <br /> Characterization work was initiated on 24 July 2018. An Addendum to the Work Plan was <br /> submitted to the CVRWQCB on 10 September 2018 documenting changes to the monitoring well <br /> design and proposing two additional borehole/monitoring well locations(Location 9 and 10). The <br /> CVRWCB approved the Addendum on 25 September 2018. A Second Addendum was submitted <br /> to the CVRWQCB on 2 November 2018 proposing additional boreholes/monitoring wells at PW2, <br /> PW35 and PW36. A Third Addendum was submitted on 8 January 2019 proposing an additional <br /> borehole/monitoring well at PW 16. This Fourth Addendum proposes one additional <br /> boreholes/monitoring wells between the Site and LWD-6 (Location). <br /> One additional borehole/monitoring well is proposed to be installed between the Site and Lathrop <br /> Water District(LWD) water supply well LWD-6 at Location 11 (Figure 1). <br /> The drilling, sampling and well construction work will be conducted in accordance with the Work <br /> Plan and the well construction details modifications described in the first Addendum to the Work <br /> Plan. Fieldwork at this location will not commence without CVRWQCB approval of this Fourth <br /> Addendum, clearance of underground utilities, procurement of an encroachment permit from the <br /> City of Lathrop, and procurement of well installation permits from the County. Please provide us <br /> engineers I scientists I innovators <br />