My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MCKINLEY
>
16051
>
2900 - Site Mitigation Program
>
PR0544578
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 2:01:46 PM
Creation date
6/3/2020 11:03:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0544578
PE
2960
FACILITY_ID
FA0025339
FACILITY_NAME
CITY OF LATHROP RIGHT OF WAY
STREET_NUMBER
16051
STREET_NAME
MCKINLEY
STREET_TYPE
AVE
City
LATHROP
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
16051 MCKINLEY AVE
P_LOCATION
07
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Lathrop <br /> ESCP Worksheet <br /> Rev.1011912017 <br /> 4.4 Non-Storm Water Pollution Control BMPs <br /> prohibitThe City ordinances <br /> unpermitted construction site.dewatering,saw-cutting or grinding Slurries,unpermitted hydrotest <br /> water,chlorinated swimminp or fountain water,concrete or paint wash out,or spills of hazardous <br /> materials or other substances. On .. <br /> locationproject;and on the site map show the of these activities. <br /> CASQA Activity Describe the BMP to be implemented. <br /> BMP Name Planned? <br /> Fact Sheet (Yes/No) If not used,state the reason why. <br /> NS-3 Paving,Sealing,Saw-cutting,Coring,and Grinding operations No These activities,if needed,will be done off <br /> site <br /> NS-7 Potable Water/Irrigation Testing and Discharge to the No All water will be containerized by the drill rig <br /> Municipal Drainage System <br /> NS-8 Vehicle and Equipment Cleaning Performed on Site No Vehicles will be cleaned off site <br /> NS-9& Vehicle and Equipment Fueling Performed on Site <br /> No Vehicles will be refueled off site <br /> W M-04 <br /> NS-10 Vehicle and Equipment Maintenance Performed on Site No Maintenance will be completed off site <br /> NS-12/13 Concrete,Stucco,Plaster,Tile,or Masonry Work <br /> No None of this work is planned <br /> &WM-08 <br /> WM-09 Temporary Sanitary Waste Facilities(part-a-potties) Yes There will be a porta potty present <br /> WM-01 Storage of Hazardous Materials on the Project Site(paints, Hazardous materials will not be used at this <br /> solvents,acids,fuel,lubricants,etc.) NO site <br /> - 10 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.