Laserfiche WebLink
EXTRAORDINARY EXPENSE OFA MONITORING WELL WITHOUTITHE ADDITIONAL <br /> SOILS REPORTS ANALYSIS. IF THE NEW SOILS .TESTS 'INDICATE CONTINUED <br /> PRESENCE OF GASOLINE, THEN.'CONSIDERATION OF ''MONITOR.ING WELL(S) IS <br /> JUSTIFIED. <br /> 3.1 SAMPLING METHODOLOGY <br /> SEE DRAWING FOR: PROPOSED SAMPLING POINTS. FALCON .ENERGY- PROPOSES <br /> THAT TWO SAMPLES BE TAKEN FROM THE NEW. BOTTOM NEAR THE CENTER OF THE <br /> EXCAVATION AND TWO-SAMPLES BE TAKEN FROM THE. SIDEWALLS --ONE -EACH FROM <br /> THE NORTH7.AND SOUTH SIDEWALLS. FALCON ENERGY' PROPOSES THAT THE TESTING <br /> PROCEDURE UTILIZE BTS( & E (8020) ,AND TPH-G (5030), <br /> AN AUTHORIZATION TO RELEASE IS ATTACHED. <br /> .410 SOIL.REMEDIATION <br /> UPON :RECEIPT -OF NEW SOILS TEST.,AND AFTER NOTIFICATION OF ENVIRONMENTAL <br /> HEALTH RENS, FALCON ,ENERGY PROPOSES:-TO AERATE THE APPROXIMATE FORTY-TWO <br /> (42) CUBIC YARDS OF SOIL ON SITE. AN AERATION PERM_I-T HAS ALREADY BEEN <br /> OBTAINED FROM SAN JOAQUIN COUNTY APCD. THE NEW SOILS ANALY.SIS -WILL <br /> 'DICTATE THE SCHEDULE TO BE. FOLLOWED. THE PRELIMINARY-SOILS TESTS RESULTS <br /> INDICATE VERY LOW SOIL CONTAMINATION AND ALLOW AERATION AT THE RATE OF <br /> EIGHT ($) =CUBIC YARDS PER DAY, IF THIS PROCEDURE IS ALLOWED, ONLY THE SOILS <br /> TO BE AERATED EACH- DAY SHALL BE UNCOVERED FROM THE HEAVY MIL PLASTIC BEING <br /> USED TO STORE SOILS ON SITE. PROCEDURES OF THE PERMIT AS ISSUED BY APO) <br /> SHALL BE FOLLOWED. <br /> 5.0 LABORATORY AND CONSULTANTS <br /> UTILIZED ' <br /> LABORATORY: BC LABORATORIES <br /> 4100.PIERCE. .ROA . <br /> B20E)SS CALIFORNIA 93308 <br /> ( 011 <br /> CONSULTANT: MR,-�;14ILLIAM CHANNELL, <br /> SEN=IOR GEOLOGIST <br /> WATERWORK <br /> 1710 -MA'IN STREET ' <br /> ESCALON CALIFORNIA 95320 <br /> (209) & 3507- <br /> if <br /> .. <br />