My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TADDEI
>
381
>
3500 - Local Oversight Program
>
PR0545708
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 11:08:49 AM
Creation date
6/3/2020 11:06:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545708
PE
3528
FACILITY_ID
FA0005432
FACILITY_NAME
LODI CONCRETE PIPE SERVICE
STREET_NUMBER
381
Direction
W
STREET_NAME
TADDEI
STREET_TYPE
RD
City
ACAMPO
Zip
95220
CURRENT_STATUS
02
SITE_LOCATION
381 W TADDEI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXTRAORDINARY EXPENSE OFA MONITORING WELL WITHOUTITHE ADDITIONAL <br /> SOILS REPORTS ANALYSIS. IF THE NEW SOILS .TESTS 'INDICATE CONTINUED <br /> PRESENCE OF GASOLINE, THEN.'CONSIDERATION OF ''MONITOR.ING WELL(S) IS <br /> JUSTIFIED. <br /> 3.1 SAMPLING METHODOLOGY <br /> SEE DRAWING FOR: PROPOSED SAMPLING POINTS. FALCON .ENERGY- PROPOSES <br /> THAT TWO SAMPLES BE TAKEN FROM THE NEW. BOTTOM NEAR THE CENTER OF THE <br /> EXCAVATION AND TWO-SAMPLES BE TAKEN FROM THE. SIDEWALLS --ONE -EACH FROM <br /> THE NORTH7.AND SOUTH SIDEWALLS. FALCON ENERGY' PROPOSES THAT THE TESTING <br /> PROCEDURE UTILIZE BTS( & E (8020) ,AND TPH-G (5030), <br /> AN AUTHORIZATION TO RELEASE IS ATTACHED. <br /> .410 SOIL.REMEDIATION <br /> UPON :RECEIPT -OF NEW SOILS TEST.,AND AFTER NOTIFICATION OF ENVIRONMENTAL <br /> HEALTH RENS, FALCON ,ENERGY PROPOSES:-TO AERATE THE APPROXIMATE FORTY-TWO <br /> (42) CUBIC YARDS OF SOIL ON SITE. AN AERATION PERM_I-T HAS ALREADY BEEN <br /> OBTAINED FROM SAN JOAQUIN COUNTY APCD. THE NEW SOILS ANALY.SIS -WILL <br /> 'DICTATE THE SCHEDULE TO BE. FOLLOWED. THE PRELIMINARY-SOILS TESTS RESULTS <br /> INDICATE VERY LOW SOIL CONTAMINATION AND ALLOW AERATION AT THE RATE OF <br /> EIGHT ($) =CUBIC YARDS PER DAY, IF THIS PROCEDURE IS ALLOWED, ONLY THE SOILS <br /> TO BE AERATED EACH- DAY SHALL BE UNCOVERED FROM THE HEAVY MIL PLASTIC BEING <br /> USED TO STORE SOILS ON SITE. PROCEDURES OF THE PERMIT AS ISSUED BY APO) <br /> SHALL BE FOLLOWED. <br /> 5.0 LABORATORY AND CONSULTANTS <br /> UTILIZED ' <br /> LABORATORY: BC LABORATORIES <br /> 4100.PIERCE. .ROA . <br /> B20E)SS CALIFORNIA 93308 <br /> ( 011 <br /> CONSULTANT: MR,-�;14ILLIAM CHANNELL, <br /> SEN=IOR GEOLOGIST <br /> WATERWORK <br /> 1710 -MA'IN STREET ' <br /> ESCALON CALIFORNIA 95320 <br /> (209) & 3507- <br /> if <br /> .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.