Laserfiche WebLink
HARRY LORI �w Wit. MICHAEL LORZ <br /> LODI CONCRETE PIPE SERVICE <br /> 381 W. TADDEi ROAD ACAMPO, CALIFORNIA 95220 (209) 369-3306 <br /> 29 %VEMBER, 1989 <br /> PUBLIC i IEALTH SERVICES <br /> SAN JOAQUIN COUNTY <br /> LNV I RONMENTAL HEALTH DIVISION <br /> P.O. Box 2009 <br /> 1601 EAST HAZELTON AVENUE <br /> STOCKTON, CALIFORNIA 95201 <br /> ATTENTION: MRS. LETITIA RESCH, SANITARIAN <br /> DEAR MRS. RESCH, <br /> IN RE: 381 !"IEST TADDEI ROAD ACAMPO CALIFORNIA 95220 SOIL REMEDIATION PLAN <br /> THE TWO GASOLINE FUEL TANKS ON OUR PROPERTY WERE REMOVED ON OCTOBER 51, <br /> 1959 IN ACCORDANCE WITH ALL APPLICABLE REGULATIONS, SOIL SAMPLE TEST RESULTS <br /> AS PERFORMED BY FGL ENVIRONMENTAL INDICATE THAT VERY 141NOR TRACES OF GASOLINE <br /> CONSTITUENTS REMAIN IN THE SOIL UNDER THE TANK BOTTOM AREAS, <br /> THIS IS NOT SURPRISING AS THESE TWO FUEL TANKS WERE IN GROUND FOR APPROXIMATELY <br /> 15 YEARS. DURING THE COURSE OF THEIR USE, THE COMPANY FILLING THEM FREQUENTLY <br /> OVERFILLED THEM SLIGHTLY OR WHEN THEY WERE TOPPED OFF DURING HOT WEATHER, <br /> EXPANSION CAUSED A SLIGHT LEAKAGE. <br /> THE COPY OF THE ENCLOSED LETTER FROM FALCON ENERGY INDICATES THAT WHEN THE <br /> TANKS WERE FILLED WITH WATER FOR TORCHING, AFTER THEY HAD BEEN PROPERLY RINSED, <br /> THEY DID NOT LEAK. THE HISTORY OF USE THEREFORE INDICATES THAT SMALL QUANTITIES <br /> OF GASOLINE PERMEATED THE SOIL FROM OVERFILLING AND EXPANSION. <br /> 11"IE THEREFORE PROPOSE THE FOLLOWING REMEDIATION MEASURES TO INSURE THAT NO <br /> CONTAMINATED DIRT REMAINS IN THE EXCAVATION AND A CLEAN CLOSURE IF EFFECTED. <br /> (1) REOPEN THE EXCAVATION TO THE HOLE BOTTOM- ( YOU HAD INSTRUCTED US <br /> TO' CLOSE THE HOLE WHILE YOU WERE ON SITE) <br /> (2) REMOVE AN ADDITIONAL FOUR (4) FEET OF SOIL FROM THE HOLE. <br /> (3) OBTAIN AN AERATION PERMIT FROM SAN JOAQUIN COUNTY APCD FOR <br /> AERATION OF THE CONT/V-11NATED SOIL ESTIMATED TO BE EIGHT (3) ;'ARDS. <br /> Accounts are due and payable on demand. Accounts over 60 days to bear interest at the rate of 1% per month. <br /> Work is guaranteed against defective workmanship for one year. Guarantee applies only if ditch is completely backfilled not <br /> earlier than three days or later than ten days after completion, and in any instance before water is put into pipeline. <br /> "Laid" price includes furnishings, delivery, laying and initial backfill of pipe in owner's properly prepared dry trench. Any <br /> additional materials and labor deemed necessary to complete a workable iob and extra material and labor for wet, unstable or <br /> hardpan conditions are to be added and billed at our prevailing rates. <br /> "Trenching" — Ditch dug by machine is for normal conditions. Extra charge will be made for excessive hardpan, unstable condi- <br /> tions or any hard labor found necessary. <br /> In the event that legal action is required to enforce any provision of this agreement, the losing party in said action shall pay <br /> to the successful party reasonable attorney's fees and costs, as determined by any court of competent jurisdiction. <br /> All estimates, quotations, orders and contracts if affected by strikes, labor difficulties, lock-outs, accidents, acts of God, or other <br /> contingencies beyond our control, will be invalid. Time of delivery, performance or quotations will be extended or increased to the <br /> extent necessitated by any of said causes. <br />