My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
3049
>
3500 - Local Oversight Program
>
PR0545717
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:23 PM
Creation date
6/3/2020 11:13:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545717
PE
3528
FACILITY_ID
FA0003912
FACILITY_NAME
MARTINIS BAIT & TACKLE
STREET_NUMBER
3049
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95240
APN
02514016
CURRENT_STATUS
02
SITE_LOCATION
3049 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T <br /> CONDOR EARTH TECHNOLOGIES INC: 1 NVIRIMErvT,q y�ALTH. <br /> nrr - <br /> January 10, 199 - 1125 No. Golden State Blvd. . .. 21663 Brian Lane - <br /> g Supe H P.O. Box 3905 <br /> P.O. Box 3448 Sonora, CA 95370 <br /> r:- <br /> -- - Turlock, CA 95381 (209)532-0361 <br />,. (209)668-9234 FAX (209)532-0773 . <br /> FAX(209)668-9248 <br /> - Ms. Maly M:eays <br /> Public Health Services, Environmental.Health Division _ <br /> San Joaquin Count),- - T <br />{ 445 San Joaquin Street <br /> : <br /> Stockton, CA 9-201'-0388 <br /> RE: Idlewild Market`iocated at-3049 West Highway l2 in Lodi, Califomia:- <br /> SUIBJECT: Work-plan addendum and rescheduling'field,w_ork:for Idlewild Market. <br /> F <br /> Dear Ms. Meays; M <br /> On. Mdy 4, 1994,-.San Joaquin County Public Health Seip ices, En.vironmentai Health" <br /> Division <br /> (SJCPHS,EHD)approved the April 8, 1994,`soil investigation work plan prepared. by.;Condor.Earth . <br /> Technologies, Inc. (Condor);-for Idlewild Market. The approved \York plan proposed drilling two <br /> vertical soil borings and one angle boring to assess the extent of.soil contamination along the north t,; <br /> sidewall of Pit I-..The-proposed soil bori;;g'locations are shown in Figure I, attached, which is a <br /> duplicate of Figure 3 in the work:plan.'r--- = <br /> Ori August 15, 1994, Condor monitored the installation of two angle borings;at Idlewiid 2 <br /> Market. Two angle borings were installed in leu of two vertical acid one angle boring due to access <br /> limitations at the site. Unfortunately, the two angle borings were installed without SJCPHS,> HD <br /> " oversight,-and are therefore--not-r valid:by-S?.CPHc;FHD:-You stated.in:yourPDecember } <br /> 8a 1994, letter to George Gemellos "T}ie-work as proposed in the approved work plan should be <br /> rescheduled by January 16,, 1995." This letter is to update SJCPHS;EHD of the current site conditions <br /> at idlewild Markel and request your approval to modify the'April 8, 1994, work plan as described <br /> below. <br /> Presently, Pit Fis-backiiied with pea gravel-to-a depth of approximately two feet below grade, <br /> thereby preventing a drill rig access to the proposed locafion of SB-2, as shown in the attached Figure <br /> 3. This was also the case on August 151 1994, when two angle borings were installed at the site. <br /> Therefore, rather than backfilling-Pit 1 to access the proposed location of SB-2, Candor recommends <br /> the following amendments to the-approved work plan; <br /> • —Installation of up to five angle borin2s, SB-I' through SB.5; at locations and angles showrk 111 <br /> .. <br /> Figure 2, attached, in leu of the two vertical .and one angle boring proposed in',the April 8,7- <br /> - 1994,-work-plan, and <br /> ENVIRONMENTAL • 4 GEOLOGICAL- • ENGINEERING. _ GEOTECHNICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.