My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
3049
>
3500 - Local Oversight Program
>
PR0545717
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:23 PM
Creation date
6/3/2020 11:13:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545717
PE
3528
FACILITY_ID
FA0003912
FACILITY_NAME
MARTINIS BAIT & TACKLE
STREET_NUMBER
3049
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95240
APN
02514016
CURRENT_STATUS
02
SITE_LOCATION
3049 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` HEALTH AND SAFETY PROCEDURES <br /> AM <br /> CONDOR EARTH TECHNOLOGIES <br /> STANDARD OPERATING PROCEDURE <br /> CONCERNING HEALTH AND SAFETY <br /> ,., Condor Earth Technologies, Inc. has adopted the following health and <br /> safety procedures for working with organic vapors and liquid contaminants <br /> encountered during investigative drilling and sampling operations. The purpose <br /> .. of this program is to provide health and safety precautions for the initial and <br /> subsequent site visits until the nature and magnitude of the contaminants have <br /> been defined. <br /> All work will be done in accordance with current OSHA regulations and all <br /> personnel working within the exclusion zone will have completed a 40-hour OSHA <br /> r- training course. A tailgate safety meeting will be held prior to commencement of <br /> work each day and a site-specific Health and Safety Plan will be discussed with <br /> and presented to all crew members for their signatures. <br /> A. Access to the project site shall be limited by the site perimeter (minimum <br /> `' of 20 feet). In no case shall the exclusion zon6 for all non-authorized <br /> personnel be less than 20 feet from the borehole location. No smoldng will <br /> be allowed in the exclusion zone. <br /> i. <br /> B. The site manager shall coordinate all activities of equipment and personnel <br /> ` at the project site. Site manager responsibilities will include the following: <br /> &W 1. Limiting access within the site perimeter to authorized personnel. <br /> 2. Providing written log of on-site activities and events. <br /> 3. On-site containment of potentially contaminated drill cuttings and <br /> water. <br /> 4. Monitoring ambient air vapor concentrations on the site perimeter. <br /> &, S. Notification of regulatory agencies during emergency procedures as <br /> defined in step C below. <br /> 6. Enforcement of site safety precautions. <br /> Page -1 of 4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.