Laserfiche WebLink
Idlewdd Market <br /> May 23, 1996 <br /> Page -6- <br /> The upper portion of the excavation should be filled with road base material Compaction testing should <br /> be performed after the placement of the road base to ensure the structural integrity of the backfill All <br /> I compaction and paving work should be conducted by a licensed contractor Upon completion of the site <br /> paving, on behalf of the property owner, Condor requests that the site be closed <br /> If the excavated area is not paved, Condor recommends that a groundwater fate/transport and risk <br /> assessment study be conducted regarding the EDB In addition, a receptor survey should be conducted <br /> to determine if there are any production wells within a 300 foot radius of the source area If the <br /> I fate/transport study, risk assessment, and receptor survey indicates that the EDB is not a threat to the <br /> public health, site closure will be requested on behalf of the property owner If you have any questions, <br /> please call us at the Turlock office (209) 668-9234 <br /> IQ�oF�ss�oNAt <br /> Respectfully submitted, Jo,yNv F <br /> CD <br /> LU 5 <br /> Iam s F ck Robert J Job Tf pF Al-1F�� <br /> G logist California ist ed <br /> Professiona Engineer, Civil <br /> #51592 <br /> ldlewiidWATETRAN RPT <br /> I <br /> I <br /> I <br /> I <br /> �w 1 <br /> �q� CONDOR <br />