My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
8751
>
3500 - Local Oversight Program
>
PR0545718
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:22 PM
Creation date
6/3/2020 11:19:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545718
PE
3528
FACILITY_ID
FA0005526
FACILITY_NAME
K2 LOGISTICS
STREET_NUMBER
8751
Direction
E
STREET_NAME
STATE ROUTE 12
City
VICTOR
Zip
95253
APN
05139001
CURRENT_STATUS
02
SITE_LOCATION
8751 E HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> i - IHE <br /> II <br /> Chaney,Walton $ McCall(LLC)- <br /> SCHEDULE r4OR PROPOSED ASSESSMENT ACTIVITIES <br /> Once Dole recehcs approval from the County on this Work Plan,activities will commence <br /> with the pre-field activities described above. The schedule for implernentmion of tine Site <br /> assessment activities and the preparation of the Addendum Report is as follows: <br /> The prep ation of pre-field plans and permits will require approximately three weeks <br /> to complete, and will be initiated following.receipt of Work Plan approval by <br /> PHS/EHV. <br /> + The field investigation and laboratory analytical testing;will require approximately <br /> five;weeks to complete following receipt of approved soil-boring permntr, This <br /> esti=te includes the standard turnaround time for laboratory analysis of soil samples. <br /> This schedule mrill be subject to availability ofthe drilling subcontractor. <br /> + The preparation of the Former VFO- Site Assessment Addendum Repor4 as outlined <br /> above will require approximately four weeks to complete fallowing the receipt and <br /> evaluation of final analytical laboratory data and information. ' <br /> In.summary,a total oftwelve weeks will be required to implement the Site Agent <br /> work described above. The Former VFO- Site Asscss nt Report will be submitted to <br /> the County at the conclusion of the assessment.,The County will be notified after the <br /> Work Plan is approved if significant changes to the schedule will be necessary, � <br /> J <br /> 4 <br /> J� <br /> I41 <br /> I <br /> I <br /> DF 0010l.sicl1Lwkp.o1lsoa 7 53[1758.8tZ8 vlf ` <br /> . roc�*oup(a,�caRhtink_i,� <br /> 8 'd <br /> 801188S(WES 'd.ae0 HW05 , / dnojo 03?!i d90z{,0 00 *2 uer <br />
The URL can be used to link to this page
Your browser does not support the video tag.