Laserfiche WebLink
i <br /> i - IHE <br /> II <br /> Chaney,Walton $ McCall(LLC)- <br /> SCHEDULE r4OR PROPOSED ASSESSMENT ACTIVITIES <br /> Once Dole recehcs approval from the County on this Work Plan,activities will commence <br /> with the pre-field activities described above. The schedule for implernentmion of tine Site <br /> assessment activities and the preparation of the Addendum Report is as follows: <br /> The prep ation of pre-field plans and permits will require approximately three weeks <br /> to complete, and will be initiated following.receipt of Work Plan approval by <br /> PHS/EHV. <br /> + The field investigation and laboratory analytical testing;will require approximately <br /> five;weeks to complete following receipt of approved soil-boring permntr, This <br /> esti=te includes the standard turnaround time for laboratory analysis of soil samples. <br /> This schedule mrill be subject to availability ofthe drilling subcontractor. <br /> + The preparation of the Former VFO- Site Assessment Addendum Repor4 as outlined <br /> above will require approximately four weeks to complete fallowing the receipt and <br /> evaluation of final analytical laboratory data and information. ' <br /> In.summary,a total oftwelve weeks will be required to implement the Site Agent <br /> work described above. The Former VFO- Site Asscss nt Report will be submitted to <br /> the County at the conclusion of the assessment.,The County will be notified after the <br /> Work Plan is approved if significant changes to the schedule will be necessary, � <br /> J <br /> 4 <br /> J� <br /> I41 <br /> I <br /> I <br /> DF 0010l.sicl1Lwkp.o1lsoa 7 53[1758.8tZ8 vlf ` <br /> . roc�*oup(a,�caRhtink_i,� <br /> 8 'd <br /> 801188S(WES 'd.ae0 HW05 , / dnojo 03?!i d90z{,0 00 *2 uer <br />