" I <br /> V <br /> Chaney, Dalton & McCall (LLC) <br /> SCHEDULE FOR PROPOSED ASSESSMENT ACTIVITIES <br /> Once Dole receives approval from the County on this Work Plan, activities will commence <br /> with the pre-field activities described above. The schedule for implementation of the Site <br /> assessment activities and the preparation of the Addendum Report is as follows: <br /> • The preparation of pre-field plans and permits will require approximately three weeks <br /> to complete, and will be initiated following receipt of Work Plan approval by <br /> PHS/EHD. <br /> • The field investigation and laboratory analytical testing will require approximately <br /> five weeks to complete following receipt of approved soil-boring permits. This <br /> estimate includes the standard turnaround time for laboratory analysis of soil samples. <br /> This schedule will be subject to availability of tl'e drilling subcontractor. <br /> The preparation of the Former VFO - Site-Assessment Addendum Report,.as outlined <br /> above will require approximately four weeks to complete following,the receipt and <br /> evaluation of final analytical laboratory data and,information. <br /> In summary, a total of twelve weeks will be required to implement the Site Assessment <br /> work described above. The Former VFO - Site Assessment Report will be submitted to <br /> the County at the conclusion of the assessment. The County will be notified after the <br /> Work Plan is approved if significant changes to the schedule will be necessary. <br /> { <br /> t <br /> DFI00101.SJCPH.wkp.011800 . 7 530.758.8128 v/f <br /> rccgroup@earthlink.net <br />