My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
13889
>
3500 - Local Oversight Program
>
PR0545719
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:47:36 PM
Creation date
6/3/2020 11:22:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545719
PE
3528
FACILITY_ID
FA0005335
FACILITY_NAME
CHARLES JACOBS
STREET_NUMBER
13889
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
13889 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Charles Jacobs -2- <br /> I <br /> investigative workplan/Corrective Action Plan(CAP)before performing any work. This phasing process <br /> and the workplan/CAP requirements were intended to: <br /> I <br /> 1. help the responsible party undertake the necessary corrective action in a cost-effective, efficient and <br /> timely manner; <br />'i 2. enable the regulatory agency to review and approve the proposed cost-effective corrective action <br /> alternative before any corrective action work was performed; and <br /> i <br />'i 3. ensure the Fund will only reimburse the most cost-effective corrective action alternative required by , <br /> the regulatory agencyto achieve the minimum cleanup necessary protect human health, safety and <br /> qm <br /> .—v �the environmentT - -' <br /> In some limited situations interim cleanup will be necessary to mitigate a demonstrated immediate <br /> hazard to public health, or the environment. Program regulations allow the responsible party to undertake <br /> interim remedial action after: (1)notifying the regulatory agency of the proposed action, and; (2) <br /> complying with any requirements that the regulatory agency may set. Interim remedial action should only <br /> be proposed when necessary to mitigate an immediate demonstrated hazard.Implementing interim <br /> { remedial action does not eliminate the requirement for a CAP and an evaluation of the most cost- <br /> effective corrective action alternative. <br /> Three bids Only corrective action costs required by the regulatory agency to protect human health, safety <br /> { and the environment can be claimed for reimbursement. You must comply with all regulatory agency <br /> i time schedules and requirements and you must obtain three bids for any required corrective action. Ifyou <br /> do not obtain three bids or a waiver of the three bid requirement, reimbursement is not assured and <br /> !� costs may be rejected as ineligible. <br /> ? If you have any questions,please contact me at(916) 341-5761. <br /> i <br /> Sincerely, <br /> i <br /> V Barbara Rempel <br /> Claims Review Unit <br /> Underground Storage Tank Cleanup Fund ./ <br /> cc: Mr. Gordon Boggs "Ms. Margaret Lagorio <br /> RWQCB,Reg. 5 - Sacramento San Joaquin County EHD <br /> 11020 Sun Center Drive P.O. Box 2009 <br /> Rancho Cordova, CA 95670 Stockton, CA 95201 <br /> California Environmenfa/Protection Agency <br /> �.d Recycled Pepel <br />
The URL can be used to link to this page
Your browser does not support the video tag.