My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
13889
>
3500 - Local Oversight Program
>
PR0545719
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:47:36 PM
Creation date
6/3/2020 11:22:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545719
PE
3528
FACILITY_ID
FA0005335
FACILITY_NAME
CHARLES JACOBS
STREET_NUMBER
13889
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
13889 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHRONOLOGY <br /> TERMINOUS MARKET <br /> 13889 VII. Highway 12, Lodi <br /> 04/27/88 Two 550 gallon gasoline underground storage tanks (UST's) were removed this <br /> date under permit-and inspection of the Environmental Health Department. Soil <br /> samples were collected beneath each UST. Analytical results of the samples <br /> confirmed contamination beneath one of the USTs. <br /> 06/30/88 Date that an Unauthorized Release Report and a Notification of Hazardous <br /> Waste Discharge form were.filed. <br /> 03/25/97 Date the site was placed in the Local Oversight Program. <br /> 03/22/00 Date four soil borings B1 through B4 were drilled at the site. <br /> 04/17/00 Date of Preliminary Investigation and'Evaluation Report that discusses the work. <br /> conducted-in March 2000. Soil.and groundwater contamination were found. <br /> 11/01/04 Monitoring wells MW1 through MW4 (screened from 5 to 25 feet) were installed <br /> on this date. <br /> 0211'1105Date of Monitoring Well Installation and Quarterly Monitoring Report that <br /> discusses the work conducted in November 2004. Low levels of soil and <br /> groundwater contamination in samples from MW3. <br /> I14 <br /> 05/10/06 Monitoring well'MW5 (screened from 5 to 25 feet) was installed on this date. <br /> 05/17/06 Monitoring well MW6 (screened from 50 to 60 feet) was installed on this date. <br /> 47110106' Date of Monitoring 2Well Installation and Quarterly Report-Second Quarter 2006 <br /> that discusses the work conducted in May 2006. <br /> 2125=28108 Soil borings B5 through B9 and soil vapor borings SV1 through SV5 were drilled <br /> during this time. <br /> 08/15/08 Date'of Additional Site Assessment Report that.discusses-the work conducted in <br /> August 2008. <br /> 10/22/09 Date of No FurfherAcfron Request that summarizes site investigation and <br /> recommends closure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.